|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 3/1/2019 Measured TD: 7163 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 3/1/2019 | Wellbore Permit | | Permit #: | 19750272 | Expiration Date: | 8/9/1975 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 9/3/1975 | Spud Date: | 4/12/1975 | Spud Date Is: | ACTUAL | Measured TD: | 7163 ft. | Measured PB depth: | 7151 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | IES | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 593 ft., Weight: 28 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7162 ft., Weight: 11.5 , Citings Type: ACTUAL | Cement: | Sacks: 125, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6323 ft. | | | | CARLILE | 6672 ft. | | | | BENTONITE | 6952 ft. | | | | D SAND | 7052 ft. | | | | J SAND | 7121 ft. | | | |
Formation DSND Formation Classification: GW Status: PR - 3/1/2019 Interval Top: 7057 ft. Interval Bottom: 7069 ft. Completed Information for Formation D SAND | 1st Production Date: | 9/4/1975 | Choke Size: | 0.000 in. | Formation Name: | D SAND | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/3/1975 | Treatment Summary: | 925 BBL OIL, 790 BBL WTR, 96,500# SAND |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7095 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/4/1975 | Test Method: | PUMPING | Hours Tested: | 10 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 2 | CALC_BBLS_OIL | 5 | CALC_GOR | 10000 | CALC_MCF_GAS | 50 | GRAVITY_OIL | 41 | MCF_GAS | 20 |
| Perforation Data: | Interval Top: | 7057 ft. | # Of Holes: | 16 | Interval Bottom: | 7069 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 3 |
Total Gas Produced (MCF) | 524 |
GOR | 174666 |
GOR Determination | MCFE |
Average BOE per Day | 0.251 |
Average MCFE per Day | 1.478 |
Federal Financial Assurance | i | |
|
|