|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/1/2022 Measured TD: 7113 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/1/2022 | Wellbore Permit | | Permit #: | 740984 | Expiration Date: | 3/25/1975 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 7/25/1977 | Spud Date: | 11/26/1974 | Spud Date Is: | ACTUAL | Measured TD: | 7113 ft. | Measured PB depth: | 7080 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 472 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 275, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7110 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 6265 ft. | | | | TIMPAS | 6550 ft. | | | | BENTONITE | 6845 ft. | | | | D SAND | 6947 ft. | | | | J SAND | 7030 ft. | | | |
Formation JSND Formation Classification: GW Status: PR - 8/1/2022 Interval Top: 7032 ft. Interval Bottom: 7072 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/25/1977 | Choke Size: | 0.421 in. | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 6964 ft. | Tubing Packer Depth: | 7000 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/2/1977 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 29 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 29 | CALC_MCF_GAS | 137 | CASING_PRESS | 600 | GRAVITY_OIL | 39.5 | MCF_GAS | 137 | TUBING_PRESS | 100 |
| Perforation Data: | Interval Top: | 7032 ft. | # Of Holes: | | Interval Bottom: | 7072 ft. | Hole Size: | |
|
Formation DSND Formation Classification: Status: AB - 7/25/1977 Interval Top: 6970 ft. Interval Bottom: 6986 ft. Completed Information for Formation D SAND | 1st Production Date: | 1/13/1975 | Choke Size: | | Formation Name: | D SAND | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 2/21/1975 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 384 | CALC_GOR | 794 | MCF_GAS | 301 |
| Perforation Data: | Interval Top: | 6970 ft. | # Of Holes: | 34 | Interval Bottom: | 6986 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 12/2023 - 11/2024 |
Total Oil Produced (Barrels) | 309 |
Total Gas Produced (MCF) | 1316 |
GOR | 4258 |
GOR Determination | BOE |
Average BOE per Day | 1.463 |
Average MCFE per Day | 8.513 |
Federal Financial Assurance | i | |
|
|