|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/18/2013 Measured TD: 8390 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/18/2013 | Wellbore Permit | | Permit #: | 19740573 | Expiration Date: | 11/25/1974 | Proposed Depth/Form: | 8400 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 0 , Unit Acreage: 80, Drill Unit: S2SW |
| | |
Wellbore Completed | Completion Date: | 9/30/1974 | Spud Date: | 8/10/1974 | Spud Date Is: | ACTUAL | Measured TD: | 8390 ft. | Measured PB depth: | 8323 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Log Types: | SP-IES & FDC-GR CALIPER | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 235 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 235 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8388 ft., Weight: 11.6/10.5, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7630 ft., Bottom: 8388 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7136 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6700 ft., Bottom: 7134 ft., Determination Method: CALC | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 844 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 474 ft., Bottom: 844 ft., Determination Method: CALC | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 525 ft. | | N | N | LARAMIE | 4332 ft. | | N | N | SUSSEX | 4620 ft. | | N | N | NIOBRARA | 7436 ft. | | N | N | CODELL | 7808 ft. | | N | N | J SAND | 8246 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 9/18/2013 Interval Top: 8268 ft. Interval Bottom: 8287 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/18/1974 | Choke Size: | 1.000 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/30/1974 | Treatment Summary: | 176,820 GALS 67,000# 100 MESH SAND 184,800# 20/40 SAND 25,500# 10/20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/29/1974 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 8 | BBLS_OIL | 16 | CASING_PRESS | 375 | GRAVITY_OIL | 60 | MCF_GAS | 2378 |
| Perforation Data: | Interval Top: | 8268 ft. | # Of Holes: | | Interval Bottom: | 8287 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 9/18/2013 Interval Top: 7580 ft. Interval Bottom: 8287 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JNBCD. |
| Perforation Data: | Interval Top: | 7580 ft. | # Of Holes: | | Interval Bottom: | 8287 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/18/2013 Interval Top: 7580 ft. Interval Bottom: 7822 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 5/30/1985 | Choke Size: | 1.000 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/30/1974 | Treatment Summary: | 3690 BL W/H2O 40000# 100 MESH, 310000# 20/40 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/3/1985 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 5 | BBLS_OIL | 15 | CALC_GOR | 6133 | GRAVITY_OIL | 48.3 | MCF_GAS | 92 |
| Perforation Data: | Interval Top: | 7580 ft. | # Of Holes: | 11 | Interval Bottom: | 7822 ft. | Hole Size: | 0.33 in. |
|
|
|
|
|
Reported Plugged | Y | 09/18/2013 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|