|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 5/13/2015 Measured TD: 8110 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 5/13/2015 | Wellbore Permit | DRIFTED | Permit #: | 19740517 | Expiration Date: | 11/8/1974 | Proposed Depth/Form: | 8120 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 9/4/1974 | Spud Date: | 7/1/1974 | Spud Date Is: | ACTUAL | Measured TD: | 8110 ft. | Measured PB depth: | 8065 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SP-IES & FDC-GR-CALIPER LOGS | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: 214 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8110 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7340 ft., Bottom: 8110 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 6226 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 5760 ft., Bottom: 6270 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 6366 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 6226 ft., Bottom: 6450 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 648 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 250 ft., Bottom: 670 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | MUDDY J | 7954 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 5/13/2015 Interval Top: 7958 ft. Interval Bottom: 7996 ft. Completed Information for Formation J SAND | 1st Production Date: | 8/14/1974 | Choke Size: | 1.000 in. | Formation Name: | J SAND | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/4/1974 | Treatment Summary: | 380,812 GALS; 130,200# 100 MESH SAND; 352,800# 20-40 SAND; 117,600# 10-20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/3/1974 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 14 | CALC_MCF_GAS | 1136 | MCF_GAS | 1136 |
| Perforation Data: | Interval Top: | 7958 ft. | # Of Holes: | 24 | Interval Bottom: | 7996 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 05/13/2015 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|