Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-08061
Well Classification: OW Status: PR - 4/1/2023
Well Name/No:ROCKY MOUNTAIN FUEL CO C #6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KP KAUFFMAN COMPANY INC - 46290
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/1/2023
FacilityID:240273LocationID:317969
County:WELD #123Location:SWNE 8 1N67W 6
Field:WATTENBERG - #90750Elevation:5005 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1650FNL  1650 FELLat/Long: 40.068178 / -104.911023Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.068480 / -104.910760Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 4/1/2023             Measured TD: 8270 ft.    Vertical TD: 8270 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 4/1/2023
Wellbore PermitDRIFTED
Permit #:19740386 Expiration Date:10/4/1974
Proposed Top PZ Location:Sec:8 Twp: 1N 67W Footage: 1650 FNL  1650 FEL
Bottom Hole Location:Sec:8 Twp: 1N 67W Footage: 1650 FNL  1650 FEL
Proposed Depth/Form:8264 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 80, Drill Unit: W2NE

Wellbore Completed
Completion Date:7/2/1974
Spud Date:6/25/1974Spud Date Is:ACTUAL
Measured TD:8270 ft.Measured PB depth:8222 ft.
True Vertical TD:8270 ft.True Vertical PB depth:7850 ft.
Top PZ Location:Sec:8 Twp: 1N 67WFootage: 1650 FNL  1650 FEL
Bottom Hole Location:Sec:8 Twp: 1N 67WFootage: 1650 FNL  1650 FEL
Log Types:CBL
Log Types:SP-IES & FDC-GR-CALIPER
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 221 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 900 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8270 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7032 ft., Bottom: 8270 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 240 ft., Depth: 1003 ft., Bottom: 1000 ft., Sacks: 300, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE700 ft.NN
SUSSEX4715 ft.NN
SHANNON5145 ft.NN
NIOBRARA7361 ft.NN
CODELL7670 ft.NN
MUDDY J8109 ft.NN

Formation JSND                     Formation Classification:  OW                     Status:  AB - 6/15/1984                 Interval Top: 8116 ft.    Interval Bottom: 8145 ft.

 Completed Information for Formation J SAND
1st Production Date:8/9/1974Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/20/1974
Treatment Summary:321,972 GALLONS 130,200# 100 MESH SAND 352,800# 20/40 SAND 117,600# 10/20 SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 10
MCF_GAS 1200
Perforation Data:
Interval Top:8116 ft.# Of Holes:30
Interval Bottom:8145 ft.Hole Size:

Formation CODL                     Formation Classification:  OW                     Status:  CM - 7/30/2020                 Interval Top: 7670 ft.    Interval Bottom: 7686 ft.

 Completed Information for Formation CODELL
1st Production Date:7/15/1984Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/22/1984
Treatment Summary:Produced from Codell only from 7/1984 thru 7/1985.
Formation Treatment
Treatment Date:8/20/1974
Treatment Summary:16,000 GAL OF METHANOL, 1710 BLW, 124 TONS CO2, 19,500# 100 MESH, 96,500# 20/40 PRE-CURED, 53,500# CURABLE SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1
BBLS_OIL 5
CALC_GOR 13000
CASING_PRESS 300
GRAVITY_OIL 49.2
MCF_GAS 66
TUBING_PRESS 300
Perforation Data:
Interval Top:7670 ft.# Of Holes:68
Interval Bottom:7686 ft.Hole Size:

Formation NB-CD                   Formation Classification:  OW                   Status:  PR - 4/1/2023                  Interval Top: 7366 ft.    Interval Bottom: 7686 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/17/1985Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:8/11/2020Treatment End Date:N/A
Treatment Summary:RBP over Codel was removed on 8/17/1985 in order to commingle w/Niobrara.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7366 ft.# Of Holes:81
Interval Bottom:7686 ft.Hole Size:

Formation NBRR                     Formation Classification:  OG                     Status:  CM - 7/30/2020                 Interval Top: 7366 ft.    Interval Bottom: 7538 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:8/17/1985Choke Size: 
Formation Name:NIOBRARACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/1985
Treatment Summary:Codell isolated w/RBP during Niobrara Frac. RBP was removed immediately after flowback to commingle with Niobrara.
Formation Treatment
Treatment Date:8/20/1974
Treatment Summary:82,000 GALS CROSS LINKED GELLED WATER, 300,000# 20/40 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2
BBLS_OIL 10
CALC_GOR 2500
CASING_PRESS 300
GRAVITY_OIL 49
MCF_GAS 25
TUBING_PRESS 300
Perforation Data:
Interval Top:7366 ft.# Of Holes:13
Interval Bottom:7538 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
12/2024 - 11/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)23
Total Gas Produced (MCF)66
GOR2869
GOR DeterminationBOE
Average BOE per Day0.098
Average MCFE per Day0.551

 Federal Financial Assurance  i 

 Tribal Well  i No