Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07967
Well Classification: GW Status: PA - 9/26/2017
Well Name/No:CHARLES R MILLIKEN UNIT #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:NOBLE ENERGY INC - 100322
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date9/26/2017
FacilityID:240179LocationID:317918
County:WELD #123Location:NWSW 18 2N64W 6
Field:WATTENBERG - #90750Elevation:4968 ft.
Planned Location:1490FSL  1010 FWLLat/Long: 40.135138 / -104.599324Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.135069 / -104.599350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 9/26/2017             Measured TD: 7790 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 9/26/2017
Wellbore PermitDRIFTED
Permit #:19731033 Expiration Date:12/14/1974
Proposed Depth/Form:7790 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 160, Drill Unit: SW/4

Wellbore Completed
Completion Date:4/9/1974
Spud Date:2/27/1974Spud Date Is:ACTUAL
Measured TD:7790 ft.Measured PB depth:7738 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES,FDC-GR CALIPER,CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 233 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 10 ft., Bottom: 233 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7773 ft., Weight: 10.50 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 6685 ft., Bottom: 7773 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 754 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 500 ft., Bottom: 754 ft., Determination Method: CALC
Casing:String Type: STAGE TOOL, Hole Size: , Size: 4.5 in., Top: , Depth: 754 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 754 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
FOX HILLS595 ft.
SUSSEX4370 ft.
NIOBRARA6910 ft.
CODELL7190 ft.
J SAND7639 ft.
MUDDY J7655 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 9/26/2017                 Interval Top: 7653 ft.    Interval Bottom: 7684 ft.

 Completed Information for Formation J SAND
1st Production Date:11/8/1974Choke Size: 
Formation Name:J SANDCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7642 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/1974Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 42
CALC_BBLS_H2O 14
CALC_BBLS_OIL 42
CALC_MCF_GAS 1018
MCF_GAS 1018
Perforation Data:
Interval Top:7653 ft.# Of Holes:
Interval Bottom:7684 ft.Hole Size:

Formation CODL                     Formation Classification:  GW                     Status:  AB - 9/26/2017                 Interval Top: 7190 ft.    Interval Bottom: 7206 ft.

 Completed Information for Formation CODELL
1st Production Date:9/13/1995Choke Size: 
Formation Name:CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7642 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/13/1995Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 47
BBLS_OIL 17
CALC_BBLS_H2O 47
CALC_BBLS_OIL 17
CALC_GOR 1765
CALC_MCF_GAS 30
CASING_PRESS 1754
MCF_GAS 30
TUBING_PRESS 1784
Perforation Data:
Interval Top:7190 ft.# Of Holes:65
Interval Bottom:7206 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 12/1/1995

 Completed Information for Formation J-CODELL
1st Production Date:12/1/1995Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Tubing Size:2.375 in.Tubing Setting Depth:7642 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/1995Test Method:FLOWING
Hours Tested:72Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 6
CALC_BBLS_OIL 2
CALC_GOR 3000
CALC_MCF_GAS 6
MCF_GAS 18
No Perforation Data was found for formation J-CDL.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY09/26/2017
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2024 - December 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No