Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07941
Well Classification: OW Status: PA - 8/1/2014
Well Name/No:CARL H ADLER #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/1/2014
FacilityID:240153LocationID:336155
Municipality/County:FIRESTONE / WELD #123Location:SWSW 35 3N68W 6
Field:WATTENBERG - #90750Elevation:4825 ft.
Planned Location:990FSL  990 FWLLat/Long: 40.177906 / -104.976146Lat/Long Source: Calculated From Footages
As Drilled Location:995 FSL  1041 FWLLat/Long: 40.177750 / -104.975810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/1/2014             Measured TD: 7859 ft.    Vertical TD: 7859 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/1/2014
Wellbore Permit
Permit #:19730950 Expiration Date:5/15/1974
Proposed Depth/Form:
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit:

Wellbore Completed
Completion Date:9/24/1974
Spud Date:8/5/1974Spud Date Is:ACTUAL
Measured TD:7859 ft.Measured PB depth:7808 ft.
True Vertical TD:7859 ft.True Vertical PB depth:
Log Types:SP-IES, FDC-GR, CALIPER LOGS
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 225 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7856 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 6760 ft., Bottom: 7856 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: 4.5 in., Top: , Depth: 2100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 1615 ft., Bottom: 2200 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS BASE500 ft.NN
SUSSEX4030 ft.NN
SHANNON4605 ft.NN
NIOBRARA7010 ft.NN
CODELL7290 ft.NN
BENTONITE7508 ft.NN
J SAND7724 ft.NN
MUDDY J7736 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 8/1/2014                  Interval Top: 7724 ft.

 Completed Information for Formation J SAND
1st Production Date:11/9/1974Choke Size:6,464.000 in.
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/24/1974
Treatment Summary:291,816 GALS 79,800 # 100 MESH SAND; 403,200# 20/40 SAND; 63,000# 10/20 SAND //
Tubing Size:2.375 in.Tubing Setting Depth:7702 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/23/1974Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 5
BBLS_OIL 10
CALC_GOR 76500
CASING_PRESS 2758
GRAVITY_OIL 60
MCF_GAS 769
No Perforation Data was found for formation JSND.

Formation CODL                     Formation Classification:  GW                     Status:  AB - 8/1/2014                  Interval Top: 7290 ft.    Interval Bottom: 7312 ft.

 Completed Information for Formation CODELL
1st Production Date:9/2/1980Choke Size: 
Formation Name:CODELLCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:9/24/1974
Treatment Summary:SPEARHEAD 500 GAL 7.5% MCA ACID VERSAGEL FRAC X 33600 GAL COND X 163000 GAL WATER, 83200# 20/40 SN; DIVERTAFRAC PUMPED 71 BBLS GEL AND 213 BBLS OF GEL WITH 4500# 20/40 SN; FLUSHED W/ 103 BBLS OF GEL. CODELL FRAC: PUMPED 524 BBLS GEL AND 984 BBLS OF GEL W/ 187000# 20/40 SN. FLUSHED WW/ 30 BBLS OF 2% KCL. MAX PSI 6600 MAX RATE 17.5 BPM. // 90944 GAL FLUID, 105355 LBS 20/40 SAND
Tubing Size:2.375 in.Tubing Setting Depth:7281 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/2005Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_GOR 5000
CALC_MCF_GAS 10
CASING_PRESS 400
MCF_GAS 10
TUBING_PRESS 320
Perforation Data:
Interval Top:7290 ft.# Of Holes:88
Interval Bottom:7312 ft.Hole Size:0.38 in.

Formation J-CDL                   Formation Classification:  GW                   Status:  CM - 8/1/2014                  Interval Top: 7290 ft.    Interval Bottom: 7759 ft.

 Completed Information for Formation J-CODELL
1st Production Date:11/28/1995Choke Size: 
Formation Name:J-CODELLCommingled:Yes
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:8/18/2006
Treatment Summary:COMMINGLED J-CDL CODL PERFS 11/1995 7290-7312 JSND PERFS 9/1974 7736-7759
Tubing Size:2.375 in.Tubing Setting Depth:7700 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/14/2006Test Method:FLOWING
Hours Tested:Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
CALC_BBLS_H2O 0
CALC_BBLS_OIL 5
CALC_GOR 13800
CALC_MCF_GAS 69
CASING_PRESS 325
GRAVITY_OIL 49
TUBING_PRESS 300
Perforation Data:
Interval Top:7290 ft.# Of Holes:
Interval Bottom:7759 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY08/01/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2024 - May 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No