Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07912
Well Classification: GW Status: PA - 4/14/2014
Well Name/No:EARL V BROTEMARKLE #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date4/14/2014
FacilityID:240124LocationID:317886
County:WELD #123Location:SWSW 24 3N66W 6
Field:WATTENBERG - #90750Elevation:5010 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FSL  990 FWLLat/Long: 40.206187 / -104.731459Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.206280 / -104.731140Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 4/14/2014             Measured TD: 8060 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 4/14/2014
Wellbore Permit
Permit #:19730889 Expiration Date:8/12/1997
Proposed Depth/Form:8020 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: W2SW

Wellbore Completed
Completion Date:7/21/1974
Spud Date:4/28/1974Spud Date Is:ACTUAL
Measured TD:8060 ft.Measured PB depth:8000 ft.
True Vertical TD:True Vertical PB depth:
Log Types:SP-IES LOG & FDC-GR CALIPER LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 206 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 206 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8060 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 7340 ft., Bottom: 8060 ft., Determination Method: CALC
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8060 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 6618 ft., Bottom: 7320 ft., Determination Method: CBL
Casing:String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 667 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 150 ft., Bottom: 667 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
J SAND7832 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  AB - 11/19/2013                Interval Top: 7889 ft.    Interval Bottom: 7940 ft.

 Completed Information for Formation J SAND
1st Production Date:6/22/1974Choke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/25/2013Treatment End Date:N/A
Treatment Summary:Set CIBP @ 7820 with 2 sacks cement. Pumped 27 sack cement from 7090 to 6618.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/21/1974
Treatment Summary:180,348 GALS; 168,000# 100 MESH SAND; 462,000# 20/40 MESH SAND; & 25,500# 10/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 11
BBLS_OIL 24
CALC_GOR 22708
CALC_MCF_GAS 545
MCF_GAS 545
Perforation Data:
Interval Top:7889 ft.# Of Holes:24
Interval Bottom:7940 ft.Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 4/14/2014                 Interval Top: 7152 ft.    Interval Bottom: 7940 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:
Production Method:PUMPING UNIT
Open Hole Completion:
Formation Treatment
Treatment Date:7/21/1974
Treatment Summary:REPERF'D CODELL FROM 7426'-7436' 07/26/01 REFRAC CODL W/261,100 # 20/40 MESH; 85,343 GAL. GELLED FLUID.
Tubing Size:2.375 in.Tubing Setting Depth:7875 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/22/2002Test Method:PUMPING UNIT
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 7
CALC_BBLS_H2O 0
CALC_BBLS_OIL 7
CALC_GOR 8571
CALC_MCF_GAS 60
GRAVITY_OIL 60
MCF_GAS 60
Perforation Data:
Interval Top:7152 ft.# Of Holes:
Interval Bottom:7940 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 11/19/2013                Interval Top: 7152 ft.    Interval Bottom: 7443 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:10/4/1996Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/25/2013Treatment End Date:N/A
Treatment Summary:Set CIBP @ 7820 with 2 sacks cement. Pumped 27 sack cement from 7090 to 6618.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:7/21/1974
Treatment Summary:NB-CD FRAC: PUMPED 1,877 BBLS OF GEL W/400,000# 20/40 SAND. MAX PSI: 6,500 PSI MAX RATE: 23.7 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:SHALE
Gas Disposal:
Test TypeMeasure
BBLS_H2O 40
BBLS_OIL 40
CALC_BBLS_H2O 40
CALC_BBLS_OIL 40
CALC_GOR 3100
CALC_MCF_GAS 124
MCF_GAS 124
Perforation Data:
Interval Top:7152 ft.# Of Holes:228
Interval Bottom:7443 ft.Hole Size:0.38 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY04/14/2014
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No