|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 3/16/2016 Measured TD: 7908 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 3/16/2016 | Wellbore Permit | | Permit #: | 19980871 | Expiration Date: | 9/23/1999 | Proposed Depth/Form: | 8000 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: SW4 | Formation And Spacing: | Code: DKJCD , Formation: DAKOTA-J-CODELL , Order: 318A , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: S2 | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: S2 |
| | |
Wellbore Completed | Completion Date: | N/A | Spud Date: | 2/14/1974 | Spud Date Is: | ACTUAL | Measured TD: | 7908 ft. | Measured PB depth: | 7901 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | | Log Types: | SP-IES, FDC-GR-CALIPER, CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 229 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 229 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7775 ft., Weight: 10.5 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 6970 ft., Bottom: 7775 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 732 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 260 ft., Bottom: 745 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: , Depth: 732 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 260 ft., Bottom: 745 ft., Determination Method: CBL | Additional Cement: | String Type: 1ST , Top: 6405 ft., Depth: 6950 ft., Bottom: 6950 ft., Sacks: 161, Method: SQUEEZE | Formation | Interval Top | Log Bottom | Cored | DSTs | FOX HILLS BASE | 550 ft. | | | | SUSSEX | 4310 ft. | | | | SHANNON | 4982 ft. | | | | NIOBRARA | 6880 ft. | | | | CODELL | 7174 ft. | | | | MUDDY J | 7624 ft. | | | | DAKOTA | 7819 ft. | | | |
Formation DKTA Formation Classification: GW Status: AB - 3/16/2016 Interval Top: 7819 ft. Completed Information for Formation DAKOTA | 1st Production Date: | 11/1/1998 | Choke Size: | | Formation Name: | DAKOTA | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | Yes |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation DKTA. |
| No Perforation Data was found for formation DKTA. |
|
Formation JSND Formation Classification: GW Status: AB - 3/16/2016 Interval Top: 7624 ft. Interval Bottom: 7666 ft. Completed Information for Formation J SAND | 1st Production Date: | 3/24/1974 | Choke Size: | 0.500 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/1/1998 | Treatment Summary: | 177,996 GALS 66,000# 100 MESH SAND 184,800# 20/40 SAND 25,500# 10/20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/2/1974 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 16 | BBLS_OIL | 33 | MCF_GAS | 1212 |
| Perforation Data: | Interval Top: | 7624 ft. | # Of Holes: | | Interval Bottom: | 7666 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 3/16/2016 Interval Top: 7174 ft. Interval Bottom: 7186 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/8/1996 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/1/1998 | Treatment Summary: | DIVERTAFRAC: PUMPED 72 BBLS OF POLYMER GEL AND 212 BBLS OF GEL WITH 4,500 LBS OF 20/40 SAND. FLUSHED WITH 103 BBLS OF 2% KCL. CODELL FRAC: PUMPED 363 BBLS OF GEL AND 853 BBLS OF GEL WITH 150,000 LBS OF 20/40 SAND. FLUSH WITH 29 BBLS OF 2% KCL. MAX PSI: 6750, MAX RATE: 16.9 |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7164 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/8/1996 | Test Method: | FLOWING | Hours Tested: | 2 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 18 | BBLS_OIL | 40 | CALC_GOR | 2450 | CASING_PRESS | 1407 | MCF_GAS | 98 | TUBING_PRESS | 1176 |
| Perforation Data: | Interval Top: | 7174 ft. | # Of Holes: | 48 | Interval Bottom: | 7186 ft. | Hole Size: | 0.38 in. |
|
Formation DKJCD Formation Classification: GW Status: CM - 3/16/2016 Interval Top: 7174 ft. Interval Bottom: 7666 ft. Completed Information for Formation DAKOTA-J-CODELL | 1st Production Date: | 11/1/1998 | Choke Size: | 0.281 in. | Formation Name: | DAKOTA-J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Date: | 11/1/1998 | Treatment Summary: | DEEPENED TO DAKOTA AND COMMINGLED WITH J-CDL |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7735 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/14/1998 | Test Method: | FLOWING | Hours Tested: | 22 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_OIL | 60 | CALC_BBLS_OIL | 65 | CALC_GOR | 25800 | CALC_MCF_GAS | 1689 | CASING_PRESS | 1140 | GRAVITY_OIL | 60 | MCF_GAS | 1548 | TUBING_PRESS | 1060 |
| Perforation Data: | Interval Top: | 7174 ft. | # Of Holes: | 82 | Interval Bottom: | 7666 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/16/2016 Interval Top: 7174 ft. Interval Bottom: 7666 ft. Completed Information for Formation J-CODELL | 1st Production Date: | 1/16/1997 | Choke Size: | | Formation Name: | J-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7626 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/16/1997 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
MCF_GAS | 30 |
| Perforation Data: | Interval Top: | 7174 ft. | # Of Holes: | 82 | Interval Bottom: | 7666 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 03/16/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|