|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 9/27/2022 Measured TD: 7620 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 9/27/2022 | Wellbore Permit | | Permit #: | 730652 | Expiration Date: | 12/13/1992 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 9/2/1973 | Spud Date: | 8/23/1973 | Spud Date Is: | ACTUAL | Measured TD: | 7620 ft. | Measured PB depth: | 7558 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 353 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 250, Top: 0 ft., Bottom: 353 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7050 ft., Bottom: 7607 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 6316 ft., Bottom: 7015 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 425, Top: 4008 ft., Bottom: 4701 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7607 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 700, Top: 240 ft., Bottom: 2055 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4315 ft. | | | | NIOBRARA | 6704 ft. | | | | CODELL | 7002 ft. | | | | CARLILE | 7010 ft. | | | | GREENHORN | 7065 ft. | | | | BENTONITE | 7288 ft. | | | | D SAND | 7398 ft. | | | | J SAND | 7444 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 12/9/2019 Interval Top: 7470 ft. Interval Bottom: 7484 ft. Completed Information for Formation J SAND | 1st Production Date: | 9/19/1973 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/21/1973 | Treatment Summary: | 38,000 GAL FLUID, 20/40 SAND & 36,000 # OKLA |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
CALC_MCF_GAS | 255 | CASING_PRESS | 420 | MCF_GAS | 255 | TUBING_PRESS | 200 |
| Perforation Data: | Interval Top: | 7470 ft. | # Of Holes: | 36 | Interval Bottom: | 7484 ft. | Hole Size: | 0.3 in. |
|
Formation CODL Formation Classification: GW Status: CM - 12/9/2019 Interval Top: 7004 ft. Interval Bottom: 7017 ft. Completed Information for Formation CODELL | 1st Production Date: | 12/23/1986 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | | Treatment Date: | 12/10/2019 | Treatment End Date: | N/A | Treatment Summary: | 6/24/2009: Codell trifrac 7004'-7017', 0.42 diameter, 3,118 bbls slurry, 246,200 lbs 20/40 | Total fluid used in treatment (bbls): | 3118 | Max pressure during treatment (psi): | 6026 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | 246200 | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 9/21/1973 | Treatment Summary: | 131,586 GAL VISTAR 22/23/24# GEL & 246,200# 20/40 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 9 | BBLS_OIL | 43 | CALC_BBLS_H2O | 9 | CALC_BBLS_OIL | 43 | CALC_GOR | 12860 | CALC_MCF_GAS | 553 | MCF_GAS | 553 | TUBING_PRESS | 560 |
| Perforation Data: | Interval Top: | 7004 ft. | # Of Holes: | 57 | Interval Bottom: | 7017 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 9/27/2022 Interval Top: 6734 ft. Interval Bottom: 7017 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 12/23/1986 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/21/1973 | Treatment Summary: | ACIDIZE W/ 500 GAL 7-1/2/% HCI 108,234 GAL 40/35# GEL FLUID, 2,500# 100 MESH & 282,000#20/40 SAND, 12/05/1986 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 30 | CALC_BBLS_OIL | 30 | CALC_GOR | 5 | CALC_MCF_GAS | 155 | CASING_PRESS | 520 | MCF_GAS | 155 | TUBING_PRESS | 180 |
| Perforation Data: | Interval Top: | 6734 ft. | # Of Holes: | 70 | Interval Bottom: | 7017 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: GW Status: CM - 12/9/2019 Interval Top: 6734 ft. Interval Bottom: 6923 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 12/23/1986 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/21/1973 | Treatment Summary: | LIMITED ENTRY FRAC |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6734 ft. | # Of Holes: | 13 | Interval Bottom: | 6923 ft. | Hole Size: | |
|
Formation SUSX Formation Classification: GW Status: AB - 12/9/2019 Interval Top: 4412 ft. Interval Bottom: 4455 ft. Completed Information for Formation SUSSEX | 1st Production Date: | 4/19/1994 | Choke Size: | | Formation Name: | SUSSEX | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/21/1973 | Treatment Summary: | SQUEEZED W/20 SX MAGNA FIBER ON 8/16/02 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 21 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 21 | CALC_GOR | 5 | CALC_MCF_GAS | 114 | CASING_PRESS | 500 | MCF_GAS | 114 | TUBING_PRESS | 650 |
| Perforation Data: | Interval Top: | 4412 ft. | # Of Holes: | 12 | Interval Bottom: | 4455 ft. | Hole Size: | 0.3 in. |
|
|
|
|
|
Reported Plugged | Y | 09/27/2022 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|