|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 1/23/2017 Measured TD: 8151 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 1/23/2017 | | Wellbore Permit | | | Permit #: | 19730573 | Expiration Date: | 12/1/1973 | | Proposed Depth/Form: | 8150 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: E2 |
| | |
| Wellbore Completed | | Completion Date: | 2/19/1974 | | Spud Date: | 12/29/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 8151 ft. | Measured PB depth: | 8100 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | SP-IES, FDC-GR-CALIPER CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 227 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 227 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8150 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7430 ft., Bottom: 8151 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8150 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 493 ft., Bottom: 866 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS BASE | 743 ft. | | N | N | | SUSSEX | 4540 ft. | | N | N | | SHANNON | 5180 ft. | | N | N | | NIOBRARA | 7190 ft. | | N | N | | CODELL | 7554 ft. | | N | N | | J SAND | 7997 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 1/23/2017 Interval Top: 8010 ft. Interval Bottom: 8035 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 2/13/1974 | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/19/1974 | | Treatment Summary: | 171,990 GALS 100,800# 100 MESH SAND 151,200# 20/40 SAND 25,500# 10/20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/18/1974 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 14 | | BBLS_OIL | 35 | | CALC_GOR | 45885 | | MCF_GAS | 1606 |
| | Perforation Data: | | Interval Top: | 8010 ft. | # Of Holes: | | | Interval Bottom: | 8035 ft. | Hole Size: | |
|
Formation CODL Formation Classification: GW Status: AB - 1/23/2017 Interval Top: 7554 ft. Interval Bottom: 7574 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 1/20/1996 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/19/1974 | | Treatment Summary: | DIVERTAFRAC: PUMPED 72 BBLS OF POLYMER GEL AND 212 BBLS OF GEL WITH 4,500 LBS OF 20/40 SAND. FLUSH WITH 104 BBLS OF 2% KCL. CODELL FRAC: PUMPED 485 BBLS OF GEL AND 898 BBLS OF GEL WITH 170,000 LBS OF 20/40 SAND. FLUSHED WITH 30 BBLS OF 2% KCL. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/20/1996 | Test Method: | FLOWING | | Hours Tested: | 12.9 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 5 | | BBLS_OIL | 28 | | CALC_BBLS_H2O | 9.3 | | CALC_BBLS_OIL | 52 | | CALC_GOR | 571 | | CALC_MCF_GAS | 29.77 | | CASING_PRESS | 1588 | | MCF_GAS | 16 | | TUBING_PRESS | 1657 |
| | Perforation Data: | | Interval Top: | 7554 ft. | # Of Holes: | 80 | | Interval Bottom: | 7574 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 2/12/1998 Interval Top: 7554 ft. Interval Bottom: 8035 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 7/26/1996 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8006 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/26/1996 | Test Method: | FLOWING | | Hours Tested: | 66 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 99 | | BBLS_OIL | 66 | | CALC_BBLS_H2O | 33 | | CALC_BBLS_OIL | 22 | | CALC_GOR | 26591 | | CALC_MCF_GAS | 585 | | MCF_GAS | 1755 |
| | Perforation Data: | | Interval Top: | 7554 ft. | # Of Holes: | | | Interval Bottom: | 8035 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 01/23/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|