|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/10/2014 Measured TD: 7910 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/10/2014 | | Wellbore Permit | | | Permit #: | 19970348 | Expiration Date: | 5/19/1998 | | Proposed Depth/Form: | 8075 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 499 , Unit Acreage: 320, Drill Unit: N2 |
| | |
| Wellbore Completed | | Completion Date: | 2/14/1974 | | Spud Date: | 8/9/1973 | Spud Date Is: | ACTUAL | | Measured TD: | 7910 ft. | Measured PB depth: | 7860 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CN, ILC | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 433 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 445 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 10 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 6051 ft., Bottom: 6680 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7910 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7176 ft., Bottom: 7910 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7910 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 350, Top: 0 ft., Bottom: 920 ft., Determination Method: CALC | | Casing: | String Type: OPEN HOLE, Hole Size: 3.875 in., Size: , Top: , Depth: 8021 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: S.C. 1.3, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 7910 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 950 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7731 ft. | | N | N | | DAKOTA | 7935 ft. | | N | N |
Formation DKTA Formation Classification: GW Status: AB - 4/10/2014 Interval Top: 7935 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/14/1974 | | Treatment Summary: | DEEPENED TO DAKOTA AND COMMINGLED WITH J SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation DKTA. |
| | No Perforation Data was found for formation DKTA. |
|
Formation JSND Formation Classification: GW Status: AB - 4/10/2014 Interval Top: 7731 ft. Interval Bottom: 7796 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | 0.000 in. | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/14/1974 | | Treatment Summary: | 318570 GALS 172200 # 100 MESH SAND 306600# 20/40 SAND 97440 # 10.20 SAND |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/13/1974 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 8 | | CALC_GOR | 24825 | | MCF_GAS | 199 |
| | Perforation Data: | | Interval Top: | 7731 ft. | # Of Holes: | | | Interval Bottom: | 7796 ft. | Hole Size: | |
|
Formation DK-J Formation Classification: GW Status: CM - 4/10/2014| Completed Information for Formation DAKOTA-JSND | | 1st Production Date: | 5/8/1998 | Choke Size: | 0.406 in. | | Formation Name: | DAKOTA-JSND | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 2/14/1974 | | Treatment Summary: | DEEPENED AND COMMINGLED WITH JSAND. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7848 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/8/1998 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 25 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 25 | | CALC_GOR | 72280 | | CALC_MCF_GAS | 1807 | | CASING_PRESS | 775 | | GRAVITY_OIL | 60 | | MCF_GAS | 1807 | | TUBING_PRESS | 600 |
| | No Perforation Data was found for formation DK-J. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/10/2014 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|