|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 11/22/2016 Measured TD: 8030 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 11/22/2016 | Wellbore Permit | | Permit #: | 19730462 | Expiration Date: | 9/18/1997 | Proposed Depth/Form: | 8000 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 320, Drill Unit: W2 | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407-66 , Unit Acreage: 80, Drill Unit: W2SW |
| | |
Wellbore Completed | Completion Date: | 11/5/1973 | Spud Date: | 8/9/1973 | Spud Date Is: | ACTUAL | Measured TD: | 8030 ft. | Measured PB depth: | 7967 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | SP-IES, FDC-GR-CALIPER | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 630 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 630 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 8030 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | Cement: | Sacks: 200, Top: 7240 ft., Bottom: 8030 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 8030 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 120, Top: 6633 ft., Bottom: 7240 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | J SAND | 7854 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 11/22/2016 Interval Top: 7857 ft. Interval Bottom: 7914 ft. Completed Information for Formation J SAND | 1st Production Date: | 10/30/1973 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/2/2010 | Treatment Summary: | SET CIBP @ 7535 W/ 2 SACKS OF CEMENT FOR MECHANICAL INTEGRITY. | Formation Treatment | Treatment Date: | 11/5/1973 | Treatment Summary: | 7857-7919' 183,330 GALS; 201,600# 100 MESH SAND; 50,400# 20/40 SAND; 16,300# 10/20 SAND |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 14 | BBLS_OIL | 54 | CALC_GOR | 25814 | CALC_MCF_GAS | 1394 | MCF_GAS | 1394 |
| Perforation Data: | Interval Top: | 7857 ft. | # Of Holes: | 80 | Interval Bottom: | 7914 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 2/12/1998 Interval Top: 7173 ft. Interval Bottom: 7919 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 6/23/1997 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/5/1973 | Treatment Summary: | COMMINGLED |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7866 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/23/1997 | Test Method: | FLOWING | Hours Tested: | 48 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 3 | BBLS_OIL | 2 | CALC_GOR | 10000 | MCF_GAS | 20 |
| Perforation Data: | Interval Top: | 7173 ft. | # Of Holes: | 256 | Interval Bottom: | 7919 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: GW Status: AB - 11/22/2016 Interval Top: 7173 ft. Interval Bottom: 7425 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 1/16/1997 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 6/8/2010 | Treatment Summary: | NBRR PERF 7173-7286 HOLES 116 SIZE 0.38. CODL PERF 7410-7425 HOLES 60 SIZE 0.38. REFRAC NBRR W/ 500 GAL 15% HCL AND 172561 GAL VISTAR HYBRID AND 250060# 20/40 SAND AND 4040# SB EXCEL. REFRAC CODL W/ 117247 GAL VISTAR AND 261300# 20/40 SAND AND 4100# SB EXCEL. | Formation Treatment | Treatment Date: | 11/5/1973 | Treatment Summary: | NB-CD FRAC: PUMPED 643 BBLS POLYMER GEL & 1,963 BBLS OF GEL W/400,000# 20/40 SAND. FLUSHED W/43 BBLS OF 2% KCL. MAX PSI: 6,450 PSI MAX RATE: 25.4 BPM. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/26/2010 | Test Method: | FLOWING | Hours Tested: | | Gas Type: | SHALE | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 50 | BBLS_OIL | 48 | BTU_GAS | 1223 | CALC_BBLS_H2O | 50 | CALC_BBLS_OIL | 30 | CALC_GOR | 1933 | CALC_MCF_GAS | 58 | CASING_PRESS | 1350 | GRAVITY_OIL | 50 | MCF_GAS | 208 |
| Perforation Data: | Interval Top: | 7173 ft. | # Of Holes: | 176 | Interval Bottom: | 7425 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
Reported Plugged | Y | 11/22/2016 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|