Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07727
Well Classification: GW Status: PA - 6/4/2018
Well Name/No:SHIVERS #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/4/2018
FacilityID:239939LocationID:317762
County:WELD #123Location:CNE 29 2N66W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1320FNL  1320 FELLat/Long: 40.112758 / -104.796540Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.112312 / -104.796302Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/4/2018             Measured TD: 8090 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/4/2018
Wellbore PermitDRIFTED
Permit #:19730384 Expiration Date:6/15/1974
Proposed Depth/Form:8050 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:N/A
Spud Date:6/23/1973Spud Date Is:ACTUAL
Measured TD:8090 ft.Measured PB depth:8052 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 588 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8088 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6570 ft., Bottom: 8088 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 117, Top: 4441 ft., Bottom: 4763 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1060 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 224, Top: 0 ft., Bottom: 1281 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4650 ft.
J SAND7863 ft.
DAKOTA8037 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/11/2006                Interval Top: 7863 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/1990
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 4
MCF_GAS 750
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/4/2018                  Interval Top: 7173 ft.    Interval Bottom: 7892 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:4/25/1990Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/28/1990Test Method:FLOWING
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 20
MCF_GAS 175
Perforation Data:
Interval Top:7173 ft.# Of Holes:
Interval Bottom:7892 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/4/2018                  Interval Top: 7173 ft.    Interval Bottom: 7892 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/18/2006
Treatment Summary:RE-FRAC'D CODELL W/ 2,381 BBLS FRAC FLUID & 217,740# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 20
BTU_GAS 1232
CALC_BBLS_OIL 42
CALC_GOR 19400
CALC_MCF_GAS 170
CASING_PRESS 1000
GRAVITY_OIL 44
MCF_GAS 388
TUBING_PRESS 600
Perforation Data:
Interval Top:7173 ft.# Of Holes:88
Interval Bottom:7892 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/04/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No