Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-07727
Well Classification: GW Status: PA - 6/4/2018
Well Name/No:SHIVERS #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PDC ENERGY INC - 69175
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date6/4/2018
FacilityID:239939LocationID:317762
County:WELD #123Location:CNE 29 2N66W 6
Field:WATTENBERG - #90750Elevation:4895 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1320FNL  1320 FELLat/Long: 40.112758 / -104.796540Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.112312 / -104.796302Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PA - 6/4/2018             Measured TD: 8090 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PA - 6/4/2018
Wellbore PermitDRIFTED
Permit #:19730384 Expiration Date:6/15/1974
Proposed Depth/Form:8050 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: JNBCD , Formation: J-NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: N2
Formation And Spacing:Code: NB-CD , Formation: NIOBRARA-CODELL , Order: , Unit Acreage: 320, Drill Unit: N2

Wellbore Completed
Completion Date:N/A
Spud Date:6/23/1973Spud Date Is:ACTUAL
Measured TD:8090 ft.Measured PB depth:8052 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL
Log Types:CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 588 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 588 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8088 ft., Weight: 10.5 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 6570 ft., Bottom: 8088 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4750 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 117, Top: 4441 ft., Bottom: 4763 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 1060 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 224, Top: 0 ft., Bottom: 1281 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
SUSSEX4650 ft.
J SAND7863 ft.
DAKOTA8037 ft.

Formation JSND                     Formation Classification:  GW                     Status:  AB - 10/11/2006                Interval Top: 7863 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:4/12/1990
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 4
MCF_GAS 750
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 6/4/2018                  Interval Top: 7173 ft.    Interval Bottom: 7892 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:4/25/1990Choke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/28/1990Test Method:FLOWING
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 20
MCF_GAS 175
Perforation Data:
Interval Top:7173 ft.# Of Holes:
Interval Bottom:7892 ft.Hole Size:

Formation NB-CD                   Formation Classification:  GW                   Status:  AB - 6/4/2018                  Interval Top: 7173 ft.    Interval Bottom: 7892 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARA-CODELLCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:10/18/2006
Treatment Summary:RE-FRAC'D CODELL W/ 2,381 BBLS FRAC FLUID & 217,740# OTTAWA 30/50 SAND & 12,000# SB EXCEL 12/20 SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 6
BBLS_OIL 20
BTU_GAS 1232
CALC_BBLS_OIL 42
CALC_GOR 19400
CALC_MCF_GAS 170
CASING_PRESS 1000
GRAVITY_OIL 44
MCF_GAS 388
TUBING_PRESS 600
Perforation Data:
Interval Top:7173 ft.# Of Holes:88
Interval Bottom:7892 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY06/04/2018
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No