|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: TA - 1/13/2026 Measured TD: 7736 ft. Vertical TD: 7736 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW TA - 1/13/2026 | | Wellbore Permit | DRIFTED | | Permit #: | 720955 | Expiration Date: | 2/23/1982 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/30/1981 | | Measured TD: | 7736 ft. | Measured PB depth: | 7600 ft. | | True Vertical TD: | 7736 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec: Twp: | Footage: 0 FL 0 FL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 300 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 300 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7700 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 6700 ft., Bottom: 7700 ft., Determination Method: CBL | | Casing: | String Type: 1ST LINER, Hole Size: 4.5 in., Size: 2.875 in., Top: 2500 ft., Depth: 6759 ft., Weight: NA , Citings Type: ACTUAL | | Cement: | Sacks: 195, Top: 2500 ft., Bottom: 6759 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 1255 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 0 ft., Bottom: 1255 ft., Determination Method: VISU |
Formation JSND Formation Classification: OW Status: AB - 8/10/1976 Interval Top: 7612 ft. Interval Bottom: 7660 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation JSND. |
| | Perforation Data: | | Interval Top: | 7612 ft. | # Of Holes: | 22 | | Interval Bottom: | 7660 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 1/13/2026 Interval Top: 7150 ft. Interval Bottom: 7161 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 12/30/1981 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/16/2006 | | Treatment Summary: | Codell formation was refrac'd by UniOil in 2006. PDS has limited information on this completion job.
106500 gals 26# Vistar crosslinked gel with 192000 lbs 20/40 sand and 8000 lbs 20/40 Super LC resin coated sand. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7150 ft. | # Of Holes: | 22 | | Interval Bottom: | 7161 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: TA - 1/13/2026 Interval Top: 6818 ft. Interval Bottom: 7161 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 8/22/2006 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NB-CD. |
| | Perforation Data: | | Interval Top: | 6818 ft. | # Of Holes: | 30 | | Interval Bottom: | 7161 ft. | Hole Size: | |
|
Formation NBRR Formation Classification: OW Status: CM - 1/13/2026 Interval Top: 6818 ft. Interval Bottom: 6922 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 8/22/2006 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/16/2006 | | Treatment Summary: | Niobrara formation was recompleted by UniOil in 2006. PDS has limited information on this completion job.
Nio A perforated from 6818'- 6826' and Nio B perforated from 6914'- 6922'. 1 11/16" guns, 90 degree phasing, 3.3 gram charges |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 6818 ft. | # Of Holes: | 8 | | Interval Bottom: | 6922 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | Y | Plugging Due Date 03/31/2029 |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (TA ) | Y | Defined Inactive 06/16/2025 |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|