Wellbore #00 Wellbore Classification: GW Status: PA - 4/5/2021 Measured TD: 8363 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/5/2021 | Wellbore Permit | | Permit #: | 19720619 | Expiration Date: | 12/3/1972 | Proposed Depth/Form: | 8300 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 |
| | |
Wellbore Completed | Completion Date: | 9/24/1972 | Spud Date: | 9/4/1972 | Spud Date Is: | ACTUAL | Measured TD: | 8363 ft. | Measured PB depth: | 8305 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CBL/GR/CCL/CDL | Log Types: | IES & GR-FDC | Casing: | String Type: CONDUCTOR, Hole Size: 13.75 in., Size: 8.625 in., Top: , Depth: 490 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 490 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 8.625 in., Top: 0 ft., Depth: 490 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 400, Top: 0 ft., Bottom: 490 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8352 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 275, Top: 6976 ft., Bottom: 8352 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 5520 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 292, Top: 4400 ft., Bottom: 5550 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: , Depth: 0 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 386, Top: 28 ft., Bottom: 826 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SUSSEX | 4770 ft. | | N | N | SHANNON | 5193 ft. | | N | N | J SAND | 8227 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 4/5/2021 Interval Top: 8230 ft. Interval Bottom: 8254 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/3/1975 | Choke Size: | 0.750 in. | Formation Name: | J SAND | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/24/1972 | Treatment Summary: | 1500 GAL 7.5% BDA 4800 GAL 3% HCL-WF20 & 43000# SAND & BEAD |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8215 ft. | Tubing Packer Depth: | 8139 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/18/1972 | Test Method: | FLOWING | Hours Tested: | 96 | Gas Type: | | Gas Disposal: | VENTED | |
Test Type | Measure |
---|
CALC_MCF_GAS | 1197 | CASING_PRESS | 475 | MCF_GAS | 5000 | TUBING_PRESS | 100 |
| Perforation Data: | Interval Top: | 8230 ft. | # Of Holes: | 21 | Interval Bottom: | 8254 ft. | Hole Size: | |
|
Formation JNBCD Formation Classification: GW Status: CM - 4/11/2000 Interval Top: 7515 ft. Interval Bottom: 8248 ft. Completed Information for Formation J-NIOBRARA-CODELL | 1st Production Date: | 6/23/1990 | Choke Size: | | Formation Name: | J-NIOBRARA-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7875 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JNBCD. |
| Perforation Data: | Interval Top: | 7515 ft. | # Of Holes: | 33 | Interval Bottom: | 8248 ft. | Hole Size: | 0.37 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 4/5/2021 Interval Top: 7515 ft. Interval Bottom: 7792 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 6/23/1990 | Choke Size: | 0.125 in. | Formation Name: | NIOBRARA-CODELL | Commingled: | Yes | Production Method: | FLOWING | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 9/24/1972 | Treatment Summary: | ACID: 500 GALLONS 7.5% BDA PUMPED AT 5 BPM. FRAC: 24,000# 100 MESH 380,000 20/40. PAD 15.5 BPM AT 6600#. AVERAGE PIR 18 BPM AT 67,000# |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 6/24/1990 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | SHALE | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_OIL | 60 | CALC_GOR | 3667 | MCF_GAS | 220 | TUBING_PRESS | 670 |
| Perforation Data: | Interval Top: | 7515 ft. | # Of Holes: | 12 | Interval Bottom: | 7792 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
Reported Plugged | Y | 04/05/2021 |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|