|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 9/9/2022 Measured TD: 7698 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 9/9/2022 | Wellbore Permit | | Permit #: | 19710993 | Expiration Date: | 8/17/1995 | Proposed Depth/Form: | 4794 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-66 , Unit Acreage: 320, Drill Unit: E2 |
| | |
Wellbore Completed | Completion Date: | 2/18/1972 | Spud Date: | 12/17/1971 | Spud Date Is: | ACTUAL | Measured TD: | 7698 ft. | Measured PB depth: | 7580 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CNI; IES; FDC-GR | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 340 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: 0 ft., Bottom: 340 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7691 ft., Weight: 10.5 , Citings Type: ACTUAL | Cement: | Sacks: 150, Top: 7062 ft., Bottom: 7691 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | SHANNON | 4616 ft. | | N | N | NIOBRARA | 6860 ft. | | N | N | FORT HAYS | 7108 ft. | | N | N | GREENHORN | 7308 ft. | | N | N | J SAND | 7555 ft. | | N | N |
Formation JSND Formation Classification: OW Status: AB - 9/9/2022 Interval Top: 7556 ft. Interval Bottom: 7592 ft. Completed Information for Formation J SAND | 1st Production Date: | 7/20/1976 | Choke Size: | | Formation Name: | J SAND | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/18/1972 | Treatment Summary: | 35000# SAND 1500 BBLS WATER |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 12 | BBLS_OIL | 22 | CALC_BBLS_H2O | 12 | CALC_BBLS_OIL | 22 | CALC_GOR | 115909 | CALC_MCF_GAS | 2550 | MCF_GAS | 2550 | TUBING_PRESS | 14.65 |
| Perforation Data: | Interval Top: | 7556 ft. | # Of Holes: | 12 | Interval Bottom: | 7592 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: CM - 11/1/2016 Interval Top: 7130 ft. Interval Bottom: 7139 ft. Completed Information for Formation CODELL | 1st Production Date: | 3/11/1995 | Choke Size: | | Formation Name: | CODELL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CODL. |
| Perforation Data: | Interval Top: | 7130 ft. | # Of Holes: | 85 | Interval Bottom: | 7139 ft. | Hole Size: | |
|
Formation NB-CD Formation Classification: OW Status: AB - 9/9/2022 Interval Top: 6870 ft. Interval Bottom: 7139 ft. Completed Information for Formation NIOBRARA-CODELL | 1st Production Date: | 3/11/1995 | Choke Size: | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 2/18/1972 | Treatment Summary: | 87000 GAL SATURN III 35/30 HT/LPH/D CROSSLINKED GEL CONTAINING 335,000# 20/40 OTTAWA WAND SPEARHEADED W/ 750 GAL 10% HCL & WO ACID FOR 5 MINS TO SOAK // REPERF CODELL 7127-7146' (76 HOLES). REFRAC CODELL W/ 131,880 GAL VISTAR 28# GEL & 248,072# 20/40 OTTAWA SAND, 11/5/03 |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 33 | BTU_GAS | 1204 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 33 | CALC_GOR | 6939 | CALC_MCF_GAS | 229 | GRAVITY_OIL | 63 | MCF_GAS | 229 | TUBING_PRESS | 180 |
| Perforation Data: | Interval Top: | 6870 ft. | # Of Holes: | 90 | Interval Bottom: | 7139 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OW Status: CM - 11/1/2016 Interval Top: 6870 ft. Interval Bottom: 6925 ft. Completed Information for Formation NIOBRARA | 1st Production Date: | 3/11/1995 | Choke Size: | | Formation Name: | NIOBRARA | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation NBRR. |
| Perforation Data: | Interval Top: | 6870 ft. | # Of Holes: | 5 | Interval Bottom: | 6925 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | Y | 09/09/2022 |
Out Of Service Repurposed | N | |
Out Of Service | Y | Plugging Due Date 12/31/2030 |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | |
|
|