|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 10/27/2016 Measured TD: 8087 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 10/27/2016 | | Wellbore Permit | DRIFTED | | Permit #: | | Expiration Date: | 11/22/2013 | | Proposed Depth/Form: | 8193 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 499-15 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 320, Drill Unit: W2 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 699 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 699 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8087 ft., Weight: 10.5/11.6, Citings Type: PLANNED | | Cement: | Sacks: 200, Top: 7300 ft., Bottom: 8087 ft. | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 4320 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: 4150 ft., Bottom: 4320 ft. | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4950 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 250, Top: 4420 ft., Bottom: 4950 ft. |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 5/6/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8087 ft. | Measured PB depth: | 8052 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | IES, FDC, GR, CNP | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 699 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 500, Top: 0 ft., Bottom: 699 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8087 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7285 ft., Bottom: 8087 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7195 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 160, Top: 6725 ft., Bottom: 7195 ft., Determination Method: CALC | | Additional Cement: | String Type: 1ST , Top: 6725 ft., Depth: 7195 ft., Bottom: 7195 ft., Sacks: 160, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7950 ft. | | N | N |
Formation JSND Formation Classification: GW Status: AB - 10/27/2016 Interval Top: 7988 ft. Interval Bottom: 8012 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 5/28/1971 | Choke Size: | 0.750 in. | | Formation Name: | J SAND | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/2/1971 | | Treatment Summary: | FRAC'D X 4000# 20/40 SAND 36,000# 10/20 SAND 4000# 12/20 BEADS 1000# 8/12 BEADS |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7914 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/2/1971 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CASING_PRESS | 900 | | MCF_GAS | 2300 | | TUBING_PRESS | 225 |
| | Perforation Data: | | Interval Top: | 7988 ft. | # Of Holes: | | | Interval Bottom: | 8012 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 10/27/2016 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|