|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PA - 4/20/2017 Measured TD: 8130 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PA - 4/20/2017 | | Wellbore Permit | DRIFTED | | Permit #: | 19710003 | Expiration Date: | 1/4/1972 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CODL , Formation: CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: J-CDL , Formation: J-CODELL , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-66 , Unit Acreage: 160, Drill Unit: NE4 |
| | |
| Wellbore Completed | | Completion Date: | N/A | | Spud Date: | 1/16/1971 | Spud Date Is: | ACTUAL | | Measured TD: | 8130 ft. | Measured PB depth: | 8064 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 214 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8129 ft., Weight: 10.5/11.6, Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7318 ft., Bottom: 8129 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 7310 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 6150 ft., Bottom: 7310 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: , Top: 0 ft., Depth: 1021 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: 1021 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 6000 ft., Depth: 8129 ft., Bottom: 7310 ft., Sacks: 125, Method: NON CEMENT SQUEEZE | | Additional Cement: | String Type: 1ST , Top: 6802 ft., Depth: 6864 ft., Bottom: 6864 ft., Sacks: 25, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 7994 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 4/20/2017 Interval Top: 7993 ft. Interval Bottom: 8030 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/30/1976 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/19/2010 | | Treatment Summary: | SET SAND PLUG @ 7800'. | | Formation Treatment | | Treatment Date: | 2/15/1971 | | Treatment Summary: | FRACED x 4000# 20/40 SN, 30,500# 10-20 SN, 4500# 12-20 BEADS. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| CALC_MCF_GAS | 310 | | MCF_GAS | 310 |
| | Perforation Data: | | Interval Top: | 7993 ft. | # Of Holes: | 42 | | Interval Bottom: | 8030 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: AB - 4/20/2017 Interval Top: 7530 ft. Interval Bottom: 7546 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 6/15/2010 | Choke Size: | | | Formation Name: | CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/27/2010 | | Treatment Summary: | REPERF CODL 7530-7540 HOLES 30 SIZE 0.38. REFRAC CODL W/ 162,960 GAL SW & 115,020# 40/70 SAND &4,000# SB EXCEL. | | Formation Treatment | | Treatment Date: | 2/15/1971 | | Treatment Summary: | PUMPED 429 BBLS OF POLYMER GEL AND 687 BBLS OF POLYMER GEL WITH 188,000 LBS OF 20/40 SAND. FLUSHED WITH 31 BBLS OF 2% KCL. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7504 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/21/2010 | Test Method: | FLOWING | | Hours Tested: | | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 28 | | BBLS_OIL | 70 | | BTU_GAS | 1309 | | CALC_BBLS_H2O | 28 | | CALC_BBLS_OIL | 17 | | CALC_GOR | 5471 | | CALC_MCF_GAS | 93 | | CASING_PRESS | 520 | | GRAVITY_OIL | 49 | | MCF_GAS | 63 | | TUBING_PRESS | 439 |
| | Perforation Data: | | Interval Top: | 7530 ft. | # Of Holes: | 94 | | Interval Bottom: | 7546 ft. | Hole Size: | 0.38 in. |
|
Formation J-CDL Formation Classification: GW Status: CM - 8/18/1995| Completed Information for Formation J-CODELL | | 1st Production Date: | 8/18/1995 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7532 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/18/1995 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3 | | BBLS_OIL | 37 | | CALC_BBLS_H2O | 3 | | CALC_BBLS_OIL | 37 | | CALC_GOR | 3784 | | CALC_MCF_GAS | 140 | | MCF_GAS | 140 |
| | No Perforation Data was found for formation J-CDL. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 04/20/2017 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|