|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 3/29/2018 Measured TD: 8315 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 3/29/2018 | | Wellbore Permit | | | Permit #: | 19700076 | Expiration Date: | 6/26/1970 | | Proposed Depth/Form: | 8300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 407-66 , Unit Acreage: 80, Drill Unit: S2SW |
| | |
| Wellbore Completed | | Completion Date: | 7/10/1970 | | Spud Date: | 3/6/1970 | Spud Date Is: | ACTUAL | | Measured TD: | 8315 ft. | Measured PB depth: | 8269 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | | | Log Types: | IES & BSC - GR | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 202 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: 202 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8308 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7526 ft., Bottom: 8308 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 913 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 775, Top: 600 ft., Bottom: 1050 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 7510 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 7075 ft., Bottom: 7465 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 7010 ft., Depth: 7450 ft., Bottom: 7468 ft., Sacks: 200, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 7340 ft. | | N | N | | TIMPAS | 7746 ft. | | N | N | | CARLILE | 7768 ft. | | N | N | | GREENHORN | 7854 ft. | | N | N | | BENTONITE | 8022 ft. | | N | N | | D SAND | 8091 ft. | | Y | N | | J SAND | 8192 ft. | | Y | N |
Formation JSND Formation Classification: OW Status: AB - 3/29/2018 Interval Top: 8215 ft. Interval Bottom: 8244 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/10/1970 | | Treatment Summary: | ACIDIZED W/1,000 GAL 7.5% HCL ACID FRAC'D W/151,900 GALS FLUID & 370,500# 20/40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 80 | | BBLS_OIL | 20 | | CALC_GOR | 24000 | | CASING_PRESS | 420 | | MCF_GAS | 480 | | TUBING_PRESS | 180 |
| | Perforation Data: | | Interval Top: | 8215 ft. | # Of Holes: | 96 | | Interval Bottom: | 8244 ft. | Hole Size: | |
|
Formation CODL Formation Classification: OW Status: AB - 3/29/2018 Interval Top: 7767 ft. Interval Bottom: 7787 ft.| Completed Information for Formation CODELL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | CODELL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/10/1970 | | Treatment Summary: | 299,000# 20/40 SAND IN 86,750 GALLONS GEL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 30 | | CALC_GOR | 5133 | | MCF_GAS | 154 | | TUBING_PRESS | 120 |
| | Perforation Data: | | Interval Top: | 7767 ft. | # Of Holes: | 80 | | Interval Bottom: | 7787 ft. | Hole Size: | |
|
Formation J-CDL Formation Classification: GW Status: CM - 3/29/2018 Interval Top: 7767 ft. Interval Bottom: 8244 ft.| Completed Information for Formation J-CODELL | | 1st Production Date: | 7/23/1992 | Choke Size: | | | Formation Name: | J-CODELL | Commingled: | Yes | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 8186 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/24/1992 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 10 | | BBLS_OIL | 18 | | CALC_GOR | 5778 | | CASING_PRESS | 540 | | MCF_GAS | 104 | | TUBING_PRESS | 100 |
| | Perforation Data: | | Interval Top: | 7767 ft. | # Of Holes: | | | Interval Bottom: | 8244 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | Y | 03/29/2018 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|