Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-123-05091
Well Classification: GW Status: PR - 5/1/2020
Well Name/No:DIER #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CRESTONE PEAK RESOURCES OPERATING LLC - 10633
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2020
FacilityID:238255LocationID:404815
County:WELD #123Location:NESE 8 2N67W 6
Field:WATTENBERG - #90750Elevation:4941 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:1980FSL  660 FELLat/Long: 40.150947 / -104.907184Lat/Long Source: Calculated From Footages
As Drilled Location:2001 FSL  660 FELLat/Long: 40.151137 / -104.906950Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/1/2020             Measured TD: 9201 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/1/2020
Wellbore PermitDRIFTED
Permit #:20021825 Expiration Date:10/9/2003
Bottom Hole Location:Sec:8 Twp: 2N 67W Footage: 2001 FSL  660 FEL
Proposed Depth/Form:8075 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: CODL , Formation: CODELL , Order: 407 407-66, Unit Acreage: 320, Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:2/9/1955Spud Date Is:ACTUAL
Measured TD:9201 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:8 Twp: 2N 67WFootage: 2001 FSL  660 FEL
Log Types:ELECTRICAL, TIME DRILLING RECORD
Log Types:
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: 0 ft., Depth: 558 ft., Weight: 38 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 558 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8034 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 8034 ft., Determination Method:
Additional Cement:String Type: 1ST , Top: 6350 ft., Depth: 7535 ft., Bottom: 7535 ft., Sacks: 300, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NIOBRARA7240 ft.NN
CODELL7447 ft.NN
GREENHORN7528 ft.NN
J SAND7895 ft.NN

Formation JSND                     Formation Classification:  GW                     Status:  PR - 5/1/2020                  Interval Top: 7898 ft.    Interval Bottom: 7940 ft.

 Completed Information for Formation J SAND
1st Production Date:7/31/2007Choke Size:0.750 in.
Formation Name:J SANDCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/24/2002
Treatment Summary:50,000 GALS GEL WTR W/ 15,000# 20/40 SD & 32,000# 10/20 SD & 1,500# 8/12 GLASSHEADS @ 44BPM @ 3,250 PSI
Tubing Size:2.375 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/1970Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:VENTED
Test TypeMeasure
CALC_MCF_GAS 2290
CASING_PRESS 1925
MCF_GAS 2290
TUBING_PRESS 1740
Perforation Data:
Interval Top:7898 ft.# Of Holes:36
Interval Bottom:7940 ft.Hole Size:0.38 in.

Formation CODL                     Formation Classification:  GW                     Status:  CM - 4/11/1955                 Interval Top: 7450 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation CODELL
1st Production Date:11/24/2002Choke Size:0.187 in.
Formation Name:CODELLCommingled:
Production Method:FLOWING
Open Hole Completion:
Formation Treatment
Treatment Date:11/24/2002
Treatment Summary:SET TBP @ 7800'. PERF THE CODELL FROM 7450'-7470' W/ 4 SPF. SET PKR @ 7300'. FRAC W/ 302,520# 20/40 FRAC SAND. FLOW BACK WELL.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/24/2002Test Method:FLOWING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 14
BBLS_OIL 27
CALC_BBLS_H2O 14
CALC_BBLS_OIL 27
CALC_GOR 2556
CALC_MCF_GAS 69
MCF_GAS 69
TUBING_PRESS 830
Perforation Data:
Interval Top:7450 ft.# Of Holes:80
Interval Bottom:7470 ft.Hole Size:0.38 in.

Formation JNBCD                   Formation Classification:  GW                   Status:  CM - 8/27/2009                 Interval Top: 7300 ft.    Interval Bottom: 7935 ft.

 Completed Information for Formation J-NIOBRARA-CODELL
1st Production Date:N/AChoke Size: 
Formation Name:J-NIOBRARA-CODELLCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/24/2002
Treatment Summary:JSND-NBRR-CDL COMMINGLE. DRILLED OUT CFP @ 7375' AND 7480' TO COMMINGLE THE JSND-NBRR-CDL. 08/24/2009.
Tubing Size:2.375 in.Tubing Setting Depth:7876 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2009Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 16
BBLS_OIL 32
BTU_GAS 1241
CALC_BBLS_H2O 16
CALC_BBLS_OIL 32
CALC_GOR 6375
CALC_MCF_GAS 204
CASING_PRESS 701
GRAVITY_OIL 51
MCF_GAS 204
TUBING_PRESS 408
Perforation Data:
Interval Top:7300 ft.# Of Holes:206
Interval Bottom:7935 ft.Hole Size:0.42 in.

Formation NB-CD                   Formation Classification:  GW                   Status:  PR - 5/1/2020                  Interval Top: 7300 ft.    Interval Bottom: 7470 ft.

 Completed Information for Formation NIOBRARA-CODELL
1st Production Date:8/24/2009Choke Size: 
Formation Name:NIOBRARA-CODELLCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/20/2009
Treatment Summary:NBRR-CDL RECOMPLETION. SET CBP @ 7480'. 07/16/09. RE-FRAC'D THE CODELL W/112,602 GAL 24# VISTAR HYBRID CROSS LINKED GEL CONTAINING 251,300# 20/40 SAND. 07/20/09. SET CFP @ 7375'. 07/29/09. FRAC'D THE NIOBRARA W/144,564 GAL 18# VISTAR CONT NEXT PAGE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation NB-CD.
Perforation Data:
Interval Top:7300 ft.# Of Holes:160
Interval Bottom:7470 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)213
Total Gas Produced (MCF)6439
GOR30230
GOR DeterminationMCFE
Average BOE per Day3.622
Average MCFE per Day21.015

 Federal Financial Assurance  i 

 Tribal Well  i No