|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 2/1/2023 Measured TD: 4040 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 2/1/2023 | | Wellbore Permit | | | Permit #: | 20071877 | Expiration Date: | 5/15/2008 | | Bottom Hole Location: | Sec:27 Twp: 3S 50W | Footage: 2310 FSL 1980 FEL | | Proposed Depth/Form: | 4060 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/11/2007 | | Spud Date: | 12/5/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 4040 ft. | Measured PB depth: | 4013 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Bottom Hole Location: | Sec:27 Twp: 3S 50W | Footage: 2310 FSL 1980 FEL | | Log Types: | TRIPLE COMBO,ARRAY INDUCTION W/LINEAR CORRELATION,COMPENSATED NEUTRON, MICRO, CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 352 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 0 ft., Bottom: 352 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4040 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 280, Top: 2270 ft., Bottom: 4040 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | J SAND | 3807 ft. | 4062 ft. | N | N |
Formation JSND Formation Classification: OW Status: PR - 2/1/2023 Interval Top: 3808 ft. Interval Bottom: 3821 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 1/11/2008 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/28/2007 | | Treatment Summary: | 500 GAL 7 1/2% HCI;12/22/07-PERF 3872-3874' 8 HOLES-SWAB-TESTED ALL WATER-ABANDONED 12/26/07 BP SET @3867' W/4 SKS CEMENT; 12/20/07-PERF 3960-3962' 8 HOLES-SWAB-TESTED WATER-ABANDONED 12/21/07 BP SET @3950' W/4 SACKS CEMENT. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 3830 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/17/2008 | Test Method: | ROD PUMP | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 13 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 13 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 15 | | GRAVITY_OIL | 22 | | MCF_GAS | 0 | | TUBING_PRESS | 15 |
| | Perforation Data: | | Interval Top: | 3808 ft. | # Of Holes: | 16 | | Interval Bottom: | 3821 ft. | Hole Size: | 0.38 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 1010 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 2.739 |
| Average MCFE per Day | 15.886 |
| Federal Financial Assurance | i | |
|
|