Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-121-06668
Well Classification: ERIW Status: PA - 10/11/2019
Well Name/No:BOBCAT D-SAND UNIT #2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WESTERN OPERATING COMPANY - 95620
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/11/2019
FacilityID:234542LocationID:317021
County:WASHINGTON #121Location:NENW 4 1S56W 6
Field:BOBCAT - #7045Elevation:4479 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FNL  2236 FWLLat/Long: 39.998664 / -103.659753Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 39.999780 / -103.659620Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: PA - 10/11/2019             Measured TD: 5190 ft.    Vertical TD: 5190 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        PA - 10/11/2019
Wellbore Permit
Permit #:19540000 Expiration Date:6/17/1955
Proposed Depth/Form:5300 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:STATESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: DSND , Formation: D SAND , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:3/29/1968
Spud Date:6/16/1954Spud Date Is:ACTUAL
Measured TD:5190 ft.Measured PB depth:5050 ft.
True Vertical TD:5190 ft.True Vertical PB depth:
Log Types:ELECTRICAL LOG
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: 0 ft., Depth: 132 ft., Weight: 29 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: , Bottom: 132 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5190 ft., Weight: 14 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: , Bottom: 5190 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA4226 ft.
TIMPAS4668 ft.
CARLILE4720 ft.
GREENHORN4782 ft.
D SAND5118 ft.

Formation DSND                     Formation Classification:  GW                     Status:  AB - 10/11/2019                Interval Top: 5145 ft.    Interval Bottom: 5168 ft.

 Completed Information for Formation D SAND
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:D SANDCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:PUMPING
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 160
CASING_PRESS 500
GRAVITY_OIL 40.3
Perforation Data:
Interval Top:5145 ft.# Of Holes:48
Interval Bottom:5168 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/11/2019
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No