|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 5/1/2025 Measured TD: 7965 ft. Vertical TD: 7820 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 5/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/27/2012 | | Proposed Top PZ Location: | Sec:29 Twp: 44N 16W | Footage: 1431 FNL 1492 FEL | | Bottom Hole Location: | Sec:29 Twp: 44N 16W | Footage: 1431 FNL 1492 FEL | | Proposed Depth/Form: | 7965 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | ANDY'S MESA U | Unit Number: | COC47585X | | Formation And Spacing: | Code: CTLR , Formation: CUTLER , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: HRMS , Formation: HERMOSA , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: , Top: , Depth: 40 ft., Weight: CONDUCTOR, Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 40 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 3770 ft., Weight: J-55 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 3770 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: , Depth: 7956 ft., Weight: P-110 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 9/28/2007 | | Spud Date: | 9/9/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 7965 ft. | Measured PB depth: | 7933 ft. | | True Vertical TD: | 7820 ft. | True Vertical PB depth: | 7788 ft. | | Top PZ Location: | Sec:29 Twp: 44N 16W | Footage: 1473 FNL 1542 FEL | | Bottom Hole Location: | Sec:29 Twp: 44N 16W | Footage: 1471 FNL 1530 FEL | | Log Types: | PEX-TRIPLE COMBO/AIT, CBL | | Log Types: | | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3770 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1300, Top: 0 ft., Bottom: 3770 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 2490 ft., Depth: 7956 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 1150, Top: 2490 ft., Bottom: 7956 ft., Determination Method: | | Casing: | String Type: 1ST LINER, Hole Size: 8.75 in., Size: 2.875 in., Top: 0 ft., Depth: 7666 ft., Weight: 6.4 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: 1ST , Top: 2490 ft., Depth: 7956 ft., Bottom: 7956 ft., Sacks: 1150, Method: PERF & PUMP | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 3770 ft., Bottom: 3770 ft., Sacks: 1300, Method: PERF & PUMP | | Formation | Interval Top | Log Bottom | Cored | DSTs | | CUTLER | 6175 ft. | 6349 ft. | | | | HONAKER TRAIL | 6427 ft. | | N | N |
Formation HNKRT Formation Classification: GW Status: SI - 2/1/2025 Interval Top: 6678 ft. Interval Bottom: 7868 ft.| Completed Information for Formation HONAKER TRAIL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | HONAKER TRAIL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/13/2008 | | Treatment Summary: | FRAC W/SLB 76000 GAL YF116ST+70Q N2 77000 GAL YF116ST+J318+60Q N2 AND 278,000# 20/40 JORDAN-UNIMIN SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7050 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/29/2007 | Test Method: | FLOW TEST | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | BBLS_OIL | 0 | | BTU_GAS | 1004 | | CALC_BBLS_H2O | 0 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 5386 | | MCF_GAS | 5386 |
| | Perforation Data: | | Interval Top: | 6678 ft. | # Of Holes: | 367 | | Interval Bottom: | 7868 ft. | Hole Size: | 3.375 in. |
|
Formation CTLR Formation Classification: GW Status: SI - 5/1/2025 Interval Top: 5725 ft. Interval Bottom: 6349 ft.| Completed Information for Formation CUTLER | | 1st Production Date: | 10/22/2010 | Choke Size: | | | Formation Name: | CUTLER | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | Yes |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6904 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/14/2010 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BTU_GAS | 1004 | | CALC_BBLS_H2O | 126 | | CALC_MCF_GAS | 354 | | CASING_PRESS | 540 | | MCF_GAS | 354 | | TUBING_PRESS | 76 |
| | Perforation Data: | | Interval Top: | 5725 ft. | # Of Holes: | 2925 | | Interval Bottom: | 6349 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 4 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | BOE |
| Average BOE per Day | 0.011 |
| Average MCFE per Day | 0.064 |
| Federal Financial Assurance | i | Y |
|
|