Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-113-06120
Well Classification: GW Status: SI - 6/1/2022
Well Name/No:FOSSIL FEDERAL #5-19
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:AMERICAN HELIUM LLC - 10841
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 56606
Facility Status:SIStatus Date6/1/2022
FacilityID:266298LocationID:333072
County:SAN MIGUEL #113Location:NWNW 19 44N16W N
Field:ANDY'S MESA - #2500Elevation:6300 ft.
Basin:PARADOX BASIN  
Planned Location:818FNL  513 FWLLat/Long: 38.063633 / -108.682587Lat/Long Source: Field Measured
As Drilled Location:839 FNL  529 FWLLat/Long: 38.063575 / -108.682529Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/10/2019
End Date: 5/10/2019
Reported: 10/9/2020
Days to report: 518
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 6/1/2022             Measured TD: 9744 ft.    Vertical TD: 9473 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 6/1/2022
Wellbore PermitDIRECTIONAL
Permit #:20030172 Expiration Date:2/20/2004
Proposed Top PZ Location:Sec: Twp: Footage: 355 FNL  280 FWL
Bottom Hole Location:Sec: Twp: Footage: 355 FNL  280 FWL
Proposed Depth/Form:10444 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:DOUBLE EAGLE UN Unit Number: 
Formation And Spacing:Code: CT-HT , Formation: CUTLER-HONAKER TRAIL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LASAL , Formation: LASAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/30/2003
Spud Date:10/26/2003Spud Date Is:ACTUAL
Measured TD:9744 ft.Measured PB depth:9667 ft.
True Vertical TD:9473 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 355 FNL  280 FWL
Bottom Hole Location:Sec: Twp: Footage: 355 FNL  280 FWL
Log Types:PLATFORM EXPRESS DIL & FDC-CNL W/BHC SONIC LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 3516 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 1040, Top: 0 ft., Bottom: 3516 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 9727 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1390, Top: 0 ft., Bottom: 9727 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
SHINARUMP4030 ft.4213 ft.NN
CUTLER4214 ft.7177 ft.NN
HONAKER TRAIL7178 ft.9744 ft.NN

Formation HNKRT                   Formation Classification:  GW                   Status:  SI - 6/1/2022                  Interval Top: 8254 ft.    Interval Bottom: 9614 ft.

 Completed Information for Formation HONAKER TRAIL
1st Production Date:N/AChoke Size: 
Formation Name:HONAKER TRAILCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:7/7/2015Treatment End Date:N/A
Treatment Summary:The previous operator erronesouly reported the top perf to be 8259'. Per the attached WBD and Operations Summary the top perf should be 8254'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/30/2003
Treatment Summary:NONE - NATURAL COMPLETION
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 3
BBLS_OIL 4
BTU_GAS 988
CALC_BBLS_H2O 3
CALC_BBLS_OIL 4
CALC_GOR 942900
CALC_MCF_GAS 3300
CASING_PRESS 1180
GRAVITY_OIL 61
MCF_GAS 3300
TUBING_PRESS 1140
Perforation Data:
Interval Top:8254 ft.# Of Holes:400
Interval Bottom:9614 ft.Hole Size:0.5 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
03/31/2022
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No