Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-113-06092
Well Classification: GW Status: SI - 7/1/2023
Well Name/No:FOSSIL FEDERAL #3-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:AMERICAN HELIUM LLC - 10841
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 056606
Facility Status:SIStatus Date7/1/2023
FacilityID:263231LocationID:316823
County:SAN MIGUEL #113Location:NWSW 13 44N17W N
Field:ANDY'S MESA - #2500Elevation:6557 ft.
Basin:PARADOX BASIN  
Planned Location:2514FSL  1294 FWLLat/Long: 38.076161 / -108.698163Lat/Long Source: Field Measured
As Drilled Location:2487 FSL  1318 FWLLat/Long: 38.076089 / -108.698074Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 7/1/2023             Measured TD: 9726 ft.    Vertical TD: 9437 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 7/1/2023
Wellbore PermitDIRECTIONAL
Permit #:20040830 Expiration Date:4/22/2005
Proposed Top PZ Location:Sec: Twp: Footage: 2198 FSL  1093 FWL
Bottom Hole Location:Sec: Twp: Footage: 964 FSL  1335 FWL
Proposed Depth/Form:10000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 
Formation And Spacing:Code: CT-HT , Formation: CUTLER-HONAKER TRAIL , Order: , Unit Acreage: 160, Drill Unit: SE/4
Formation And Spacing:Code: LASAL , Formation: LASAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/22/2004
Spud Date:5/30/2004Spud Date Is:ACTUAL
Measured TD:9726 ft.Measured PB depth:9616 ft.
True Vertical TD:9437 ft.True Vertical PB depth:9343 ft.
Top PZ Location:Sec: Twp: Footage: 2198 FSL  1093 FWL
Bottom Hole Location:Sec: Twp: Footage: 964 FSL  1335 FWL
Log Types:TRIPLE LIGHO DENSITY-CNL; DSI-HRLA POROSITY-DENSITY-GR GALIPER; XPT & FMI
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 3438 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 1172, Top: 0 ft., Bottom: 3438 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 9690 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1210, Top: 1700 ft., Bottom: 9690 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
HONAKER TRAIL8828 ft.9516 ft.NN
ISMAY9549 ft.9615 ft.NN

Formation ISMY                     Formation Classification:  GW                     Status:  SI - 7/1/2023                  Interval Top: 9549 ft.    Interval Bottom: 9615 ft.

 Completed Information for Formation ISMAY
1st Production Date:N/AChoke Size: 
Formation Name:ISMAYCommingled:No
Production Method:NON-PRODUCING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2004
Treatment Summary:NONE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/13/2004Test Method:NO FLOW
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 1032
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 0
MCF_GAS 0
TUBING_PRESS 0
Perforation Data:
Interval Top:9549 ft.# Of Holes:196
Interval Bottom:9615 ft.Hole Size:3.375 in.

Formation HN-IS                   Formation Classification:  GW                   Status:  CM - 12/1/2019                 Interval Top: 8828 ft.    Interval Bottom: 9615 ft.

 Completed Information for Formation HONAKER TRAIL-ISMAY
1st Production Date:N/AChoke Size:0.266 in.
Formation Name:HONAKER TRAIL-ISMAYCommingled:Yes
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2004
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:8800 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/23/2004Test Method:FLOWING
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 28
BTU_GAS 1018
CALC_BBLS_H2O 0
CALC_BBLS_OIL 28
CALC_GOR 197968
CALC_MCF_GAS 5456
CASING_PRESS 2200
GRAVITY_OIL 59
MCF_GAS 5456
TUBING_PRESS 2000
Perforation Data:
Interval Top:8828 ft.# Of Holes:
Interval Bottom:9615 ft.Hole Size:

Formation HNKRT                   Formation Classification:  GW                   Status:  SI - 7/1/2023                  Interval Top: 8828 ft.    Interval Bottom: 9516 ft.

 Completed Information for Formation HONAKER TRAIL
1st Production Date:N/AChoke Size: 
Formation Name:HONAKER TRAILCommingled:No
Production Method:CHOKE CALCULATION TO FLOW PIT
Open Hole Completion:No
Formation Treatment
Treatment Date:7/22/2004
Treatment Summary:NONE
Tubing Size:5.5 in.Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/15/2004Test Method:FLOWING
Hours Tested:6Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 1
BTU_GAS 1017
CALC_BBLS_H2O 0
CALC_BBLS_OIL 24
CALC_GOR 421041
CALC_MCF_GAS 10105
CASING_PRESS 1700
GRAVITY_OIL 59
MCF_GAS 2736
Perforation Data:
Interval Top:8828 ft.# Of Holes:452
Interval Bottom:9516 ft.Hole Size:3.375 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
06/30/2023
Low ProducingYProduction Period
09/2024 - 08/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No