Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-113-06071
Well Classification: GW Status: TA - 11/1/2017
Well Name/No:ANDY'S MESA FEDERAL #16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:AMERICAN HELIUM OPERATING LLC - 10841
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC 85924
Facility Status:TAStatus Date11/1/2017
FacilityID:256809LocationID:316813
County:SAN MIGUEL #113Location:NESE 28 44N16W N
Field:ANDY'S MESA - #2500Elevation:6465 ft.
Planned Location:1800FSL  500 FELLat/Long: 38.041807 / -108.632649Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 38.041880 / -108.632610Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: TA - 11/1/2017             Measured TD: 9106 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        TA - 11/1/2017
Wellbore Permit
Permit #:000171 Expiration Date:2/27/2001
Prop Depth/Form:8780 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:ANDY'S MESA Unit Number: 
Formation And Spacing:Code: CTARK , Formation: CUTLER-ARKOSE , Order: , Unit Acreage: 40, Drill Unit: NESE
Formation And Spacing:Code: HNKRT , Formation: HONAKER TRAIL , Order: , Unit Acreage: 40, Drill Unit: NESE
Formation And Spacing:Code: ISMY , Formation: ISMAY , Order: , Unit Acreage: 40, Drill Unit: NESE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: , Depth: 120 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 120 ft.

Wellbore Completed
Completion Date:10/30/2000
Spud Date:6/30/2000Spud Date Is:ACTUAL
Measured TD:9106 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:7473 ft.
Log Types:MICROLOG,BOREHOLE COMPESATED SONIC,ARRAY IND,COMPENSATED NEUTRON TRIPLE LITHO DENSITY
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2738 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 268, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 9.625 in., Size: 5.5 in., Top: 0 ft., Depth: 9106 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1749, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
SHINARUMP3065 ft.3196 ft.NN
MOENKOPI3197 ft.3905 ft.NN
CUTLER3906 ft.5141 ft.NN
CUTLER-ARKOSE5142 ft.7293 ft.NN
ISMAY8230 ft.9097 ft.NN
PARADOX9098 ft.NN

Formation ISMY                     Formation Classification:  GW                     Status:  AB - 5/15/2015                 Interval Top: 9044 ft.    Interval Bottom: 9062 ft.

 Completed Information for Formation ISMAY
1st Production Date:N/AChoke Size: 
Formation Name:ISMAYCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation ISMY.
Perforation Data:
Interval Top:9044 ft.# Of Holes:72
Interval Bottom:9062 ft.Hole Size:

Formation HNKRT                   Formation Classification:  GW                   Status:  AB - 5/15/2015                 Interval Top: 7520 ft.    Interval Bottom: 7562 ft.

 Completed Information for Formation HONAKER TRAIL
1st Production Date:N/AChoke Size: 
Formation Name:HONAKER TRAILCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation HNKRT.
Perforation Data:
Interval Top:7520 ft.# Of Holes:156
Interval Bottom:7562 ft.Hole Size:

Formation CTARK                   Formation Classification:  GW                   Status:  CM - 12/20/2001                Interval Top: 6432 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation CUTLER-ARKOSE
1st Production Date:N/AChoke Size:0.188 in.
Formation Name:CUTLER-ARKOSECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/30/2000
Treatment Summary:NONE
Tubing Size:2.375 in.Tubing Setting Depth:6977 ft.
Tubing Packer Depth:6382 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/3/2000Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 2
CALC_BBLS_H2O 0
CALC_BBLS_OIL 2
CALC_MCF_GAS 910
CASING_PRESS 0
MCF_GAS 910
TUBING_PRESS 1252
Perforation Data:
Interval Top:6432 ft.# Of Holes:4
Interval Bottom:7240 ft.Hole Size:

Formation CTLR                     Formation Classification:  GW                     Status:  AB - 8/19/2015                 Interval Top: 5414 ft.    Interval Bottom: 7240 ft.

 Completed Information for Formation CUTLER
1st Production Date:N/AChoke Size: 
Formation Name:CUTLERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:5/15/2015Treatment End Date:N/A
Treatment Summary:CIBP set @ 5350' with two sacks of cement abandoning the Cutler perforations. Historically a CIBP set @ 6370' temporarily abandoning perforations 6432' - 6445'; CIBP set @ 6582' temporarily abandoning perforations 6636' - 6708'; CIBP set @ 6727' temporarily abandoning perforations 6752' - 7070'; RBP set @ 7115' 11/6/2000 temporarily abandoning 7136' - 7240'.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/30/2000
Treatment Summary:NONE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
MCF_GAS 0
TUBING_PRESS 400
Perforation Data:
Interval Top:5414 ft.# Of Holes:1156
Interval Bottom:7240 ft.Hole Size:0.39 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (TA )YDefined Inactive
05/31/2015
Low ProducingYProduction Period
10/2023 - 09/2024

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No