Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-113-06069
Well Classification: GW Status: SI - 12/1/2022
Well Name/No:FOSSIL FEDERAL #5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:AMERICAN HELIUM LLC - 10841
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date12/1/2022
FacilityID:89428LocationID:333072
County:SAN MIGUEL #113Location:NWNW 19 44N16W N
Field:ANDY'S MESA - #2500Elevation:6678 ft.
Basin:PARADOX BASIN  
Planned Location:915FNL  605 FWLLat/Long: 38.063365 / -108.682268Lat/Long Source: Calculated From Footages
As Drilled Location:920 FNL  602 FWLLat/Long: 38.063350 / -108.682276Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 12/1/2022             Measured TD: 9635 ft.    Vertical TD: 9621 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 12/1/2022
Wellbore PermitDIRECTIONAL
Permit #:990261 Expiration Date:4/29/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number: 

Wellbore Completed
Completion Date:11/4/1999
Spud Date:8/10/1999Spud Date Is:ACTUAL
Measured TD:9635 ft.Measured PB depth:
True Vertical TD:9621 ft.True Vertical PB depth:
Bottom Hole Location:Sec: Twp: Footage: 865 FNL  820 FWL
Log Types:LTL,CNL-CD,ML,SONIC,CMR,FMI,RFT,VSP,CBL-CET,CCL-GR
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: , Depth: 270 ft., Weight: 68 , Citings Type: ACTUAL
Cement:Sacks: 565, Top: , Bottom: 270 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 3340 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 3375, Top: , Bottom: 3375 ft., Determination Method: CALC
Casing:String Type: 3RD, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 9631 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1937, Top: 500 ft., Bottom: 9631 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MORRISON240 ft.940 ft.NN
ENTRADA940 ft.1170 ft.NN
NAVAJO1170 ft.1846 ft.NN
CHINLE2355 ft.2754 ft.NN
SHINARUMP2754 ft.2830 ft.NN
MOENKOPI2830 ft.3314 ft.NN
CUTLER3314 ft.7126 ft.YN
HONAKER TRAIL7126 ft.8762 ft.YN
ISMAY9446 ft.9593 ft.YN

Formation HNKRT                   Formation Classification:  GW                   Status:  SI - 12/1/2022                 Interval Top: 8259 ft.    Interval Bottom: 9614 ft.

 Completed Information for Formation HONAKER TRAIL
1st Production Date:N/AChoke Size:0.500 in.
Formation Name:HONAKER TRAILCommingled:No
Production Method:FLOWING
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/1999
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:8983 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/4/1999Test Method:FLOWING
Hours Tested:1Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
CALC_MCF_GAS 8140
CASING_PRESS 1300
MCF_GAS 8140
Perforation Data:
Interval Top:8259 ft.# Of Holes:400
Interval Bottom:9614 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
11/30/2022
Low ProducingYProduction Period
09/2024 - 08/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i Y

 Tribal Well  i No