|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2024 Measured TD: 12905 ft. Vertical TD: 12774 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/26/2015 | Prop Depth/Form: | 12885 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | Cement: | Sacks: 60, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3914 ft., Weight: 32.3 , Citings Type: PLANNED | Cement: | Sacks: 1420, Top: 0 ft., Bottom: 3914 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12885 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1337, Top: 7830 ft., Bottom: 12885 ft. |
| | |
Wellbore Completed | Completion Date: | 5/27/2014 | Spud Date: | 4/23/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12905 ft. | Measured PB depth: | 12812 ft. | True Vertical TD: | 12774 ft. | True Vertical PB depth: | 12681 ft. | Top PZ Location: | Sec:24 Twp: 1S 98W | Footage: 2327 FNL 638 FEL | Depth | Bottom Hole Location: | Sec:24 Twp: 1S 98W | Footage: 2320 FNL 658 FEL | Depth | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL | Cement: | Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3926 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 1245, Top: 0 ft., Bottom: 3926 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12895 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1817, Top: 6240 ft., Bottom: 12895 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: , Depth: 1794 ft., Bottom: , Sacks: 875, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH G | 5837 ft. | | | | MESAVERDE | 8023 ft. | | | | CAMEO | 11123 ft. | | | | ROLLINS | 11674 ft. | | | | COZZETTE | 11815 ft. | | | | CORCORAN | 12028 ft. | | | | SEGO | 12406 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 9/1/2024 Interval Top: 12411 ft. Interval Bottom: 12778 ft. Completed Information for Formation SEGO | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | SEGO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/15/2014 | Treatment Summary: | 1000 Gals 10% HCL; 224658# 40/70 Sand; 21750# 20/40 Sand; 9347 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 9372 | Max pressure during treatment (psi): | 6981 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 2 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.60 | Recycled water used in treatment (bbls): | 9348 | Total flowback volume recovered (bbls): | 20244 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 246408 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SEGO. |
| Perforation Data: | Interval Top: | 12411 ft. | # Of Holes: | 48 | Interval Bottom: | 12778 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 9/1/2024 Interval Top: 12068 ft. Interval Bottom: 12357 ft. Completed Information for Formation CORCORAN | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | CORCORAN | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/15/2014 | Treatment End Date: | 7/15/2014 | Treatment Summary: | 500 Gals 10% HCL; 135646# 40/70 Sand; 10000# 20/40 Sand; 5258 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 5270 | Max pressure during treatment (psi): | 6981 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.60 | Recycled water used in treatment (bbls): | 5258 | Total flowback volume recovered (bbls): | 20244 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 145646 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CRCRN. |
| Perforation Data: | Interval Top: | 12068 ft. | # Of Holes: | 24 | Interval Bottom: | 12357 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 9/1/2024 Interval Top: 9941 ft. Interval Bottom: 11583 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/16/2014 | Treatment End Date: | 7/19/2014 | Treatment Summary: | 3000 Gals 10% HCL; 639087# 40/70 Sand; 53940# 20/40 Sand; 25447 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 25519 | Max pressure during treatment (psi): | 6981 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 6 | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.60 | Recycled water used in treatment (bbls): | 25448 | Total flowback volume recovered (bbls): | 20244 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 693027 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCM. |
| Perforation Data: | Interval Top: | 9941 ft. | # Of Holes: | 144 | Interval Bottom: | 11583 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OW Status: CM - 8/31/2014 Interval Top: 9941 ft. Interval Bottom: 12778 ft. Completed Information for Formation WILLIAMS FORK-ILES | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/19/2014 | Treatment Summary: | 4500 Gals 10% HCL; 999391# 40/70 Sand; 85690# 20/40 Sand; 40053 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 40161 | Max pressure during treatment (psi): | 6981 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 9 | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.60 | Recycled water used in treatment (bbls): | 40054 | Total flowback volume recovered (bbls): | 20244 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 1085081 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12186 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/31/2014 | Test Method: | Flowing | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1079 | CALC_MCF_GAS | 1361 | CASING_PRESS | 2222 | MCF_GAS | 1361 | TUBING_PRESS | 1716 |
| Perforation Data: | Interval Top: | 9941 ft. | # Of Holes: | 216 | Interval Bottom: | 12778 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 175 |
Total Gas Produced (MCF) | 21163 |
GOR | 120931 |
GOR Determination | MCFE |
Average BOE per Day | 10.453 |
Average MCFE per Day | 60.625 |
Federal Financial Assurance | i | Y |
|
|