|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2024 Measured TD: 12783 ft. Vertical TD: 12769 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2024 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/26/2015 | Prop Depth/Form: | 12786 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | Cement: | Sacks: 60, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3901 ft., Weight: 32.3 , Citings Type: PLANNED | Cement: | Sacks: 1415, Top: 0 ft., Bottom: 3901 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12786 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1317, Top: 7716 ft., Bottom: 12786 ft. |
| | |
Wellbore Completed | Completion Date: | 5/8/2014 | Spud Date: | 4/11/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12783 ft. | Measured PB depth: | 12717 ft. | True Vertical TD: | 12769 ft. | True Vertical PB depth: | 12703 ft. | Top PZ Location: | Sec:24 Twp: 1S 98W | Footage: 2539 FSL 1775 FEL | Depth | Bottom Hole Location: | Sec:24 Twp: 1S 98W | Footage: 2523 FSL 1766 FEL | Depth | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL | Cement: | Sacks: 25, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3924 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 795, Top: 0 ft., Bottom: 3924 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12773 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1815, Top: 6444 ft., Bottom: 12773 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1804 ft., Bottom: 1804 ft., Sacks: 1100, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH G | 5832 ft. | | | | MESAVERDE | 7898 ft. | | | | CAMEO | 11022 ft. | | | | ROLLINS | 11562 ft. | | | | COZZETTE | 11693 ft. | | | | CORCORAN | 11912 ft. | | | | SEGO | 12302 ft. | | | |
Formation SEGO Formation Classification: OW Status: SI - 9/1/2024 Interval Top: 12320 ft. Interval Bottom: 12485 ft. Completed Information for Formation SEGO | 1st Production Date: | 7/13/2014 | Choke Size: | | Formation Name: | SEGO | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/30/2014 | Treatment End Date: | 7/30/2014 | Treatment Summary: | 500 Gals 7 1/2% HCL; 79419#40/70, 6250 20/40 Sand; 2985 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| Total fluid used in treatment (bbls): | 2996 | Max pressure during treatment (psi): | 6926 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.57 | Recycled water used in treatment (bbls): | 2985 | Total flowback volume recovered (bbls): | 21105 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 85669 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SEGO. |
| Perforation Data: | Interval Top: | 12320 ft. | # Of Holes: | 27 | Interval Bottom: | 12485 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: SI - 9/1/2024 Interval Top: 11952 ft. Interval Bottom: 12249 ft. Completed Information for Formation CORCORAN | 1st Production Date: | 7/13/2014 | Choke Size: | | Formation Name: | CORCORAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/30/2014 | Treatment End Date: | 7/30/2014 | Treatment Summary: | 500 Gals 7 1/2% HCL; 129135#40/70, 8750 20/40 Sand; 5045 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| Total fluid used in treatment (bbls): | 5056 | Max pressure during treatment (psi): | 7300 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.61 | Recycled water used in treatment (bbls): | 5045 | Total flowback volume recovered (bbls): | 21105 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 137885 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CRCRN. |
| Perforation Data: | Interval Top: | 11952 ft. | # Of Holes: | 35 | Interval Bottom: | 12249 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OG Status: TA - 8/1/2023 Interval Top: 9907 ft. Interval Bottom: 12485 ft. Completed Information for Formation WILLIAMS FORK-ILES | 1st Production Date: | 9/3/2014 | Choke Size: | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/30/2014 | Treatment End Date: | 9/3/2014 | Treatment Summary: | 4000 Gals 7 1/2% HCL; 1081319#40/70, 55000# 20/40 Sand; 31142.85 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| Total fluid used in treatment (bbls): | 31237 | Max pressure during treatment (psi): | 7712 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 6 | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | 0.50 | Recycled water used in treatment (bbls): | 31142 | Total flowback volume recovered (bbls): | 21105 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 1136319 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1148 | CALC_MCF_GAS | 624 | CASING_PRESS | 1323 | MCF_GAS | 624 | TUBING_PRESS | 807 |
| Perforation Data: | Interval Top: | 9907 ft. | # Of Holes: | 195 | Interval Bottom: | 12485 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: OG Status: TA - 8/1/2023 Interval Top: 9553 ft. Interval Bottom: 9856 ft. Completed Information for Formation WILLIAMS FORK | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WILLIAMS FORK | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WMFK. |
| Perforation Data: | Interval Top: | 9553 ft. | # Of Holes: | 24 | Interval Bottom: | 9856 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: TA - 10/17/2024 Interval Top: 8974 ft. Interval Bottom: 9529 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | N/A | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/21/2018 | Treatment End Date: | 6/18/2018 | Treatment Summary: | 14209 bbls of slickwater; No Proppant; 642 gals of biocide | Total fluid used in treatment (bbls): | 14224 | Max pressure during treatment (psi): | 7712 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 4 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.50 | Recycled water used in treatment (bbls): | 14209 | Total flowback volume recovered (bbls): | 21105 | Fresh water used in treatment (bbls): | 15 | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/30/2014 | Treatment End Date: | 9/3/2014 | Treatment Summary: | 3000 Gals 7 1/2% HCL; 572765#40/70, 40000 20/40 Sand; 23112 Bbls Slickwater; (Summary)
*All flowback water entries are total estimates based on comingled volumes.
| Total fluid used in treatment (bbls): | 23184 | Max pressure during treatment (psi): | 7712 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 6 | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.50 | Recycled water used in treatment (bbls): | 23113 | Total flowback volume recovered (bbls): | 21105 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 612765 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCM. |
| Perforation Data: | Interval Top: | 8974 ft. | # Of Holes: | 72 | Interval Bottom: | 9529 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | Y | Production Period 10/2023 - 09/2024 |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 149 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.071 |
Average MCFE per Day | 0.407 |
Federal Financial Assurance | i | Y |
|
|