Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2021 Measured TD: 12966 ft. Vertical TD: 12753 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2021 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/26/2015 | | Proposed Top PZ Location: | Sec:24 Twp: 1S 98W | Footage: 1477 FSL 1902 FWL | | Bottom Hole Location: | Sec:24 Twp: 1S 98W | Footage: 1476 FSL 1890 FWL | | Proposed Depth/Form: | 13001 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3928 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 1426, Top: 0 ft., Bottom: 3928 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 13001 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1340, Top: 7902 ft., Bottom: 13001 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/16/2014 | | Spud Date: | 4/17/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12966 ft. | Measured PB depth: | 12842 ft. | | True Vertical TD: | 12753 ft. | True Vertical PB depth: | 12629 ft. | | Top PZ Location: | Sec:24 Twp: 1S 98W | Footage: 1477 FSL 1902 FWL | | Bottom Hole Location: | Sec:24 Twp: 1S 98W | Footage: 1476 FSL 1890 FWL | | Log Types: | SP/GR/HDIL/ZDL/CN/CBL/MUD | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3984 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 1060, Top: 0 ft., Bottom: 3984 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12956 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1820, Top: 6250 ft., Bottom: 12956 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: , Depth: 1750 ft., Bottom: , Sacks: 865, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5822 ft. | | | | | MESAVERDE | 8071 ft. | | | | | CAMEO | 11092 ft. | | | | | ROLLINS | 11744 ft. | | | | | COZZETTE | 11880 ft. | | | | | CORCORAN | 12106 ft. | | | | | SEGO | 12510 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 2/1/2021 Interval Top: 12514 ft. Interval Bottom: 12800 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 7/16/2014 | Choke Size: | | | Formation Name: | SEGO | Commingled: | | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/14/2014 | | Treatment Summary: | 1000 Gals 10% HCL; 6742 Bbls Slickwater; 161435 # 40/70 Sand; 10625 # 20/40 Sand; (Summary) | | Total fluid used in treatment (bbls): | 6766 | Max pressure during treatment (psi): | 6358 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 6742 | Total flowback volume recovered (bbls): | 19352 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 172060 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12514 ft. | # Of Holes: | 42 | | Interval Bottom: | 12800 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 2/1/2021 Interval Top: 12196 ft. Interval Bottom: 12468 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 7/16/2014 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/15/2014 | Treatment End Date: | 7/15/2014 | | Treatment Summary: | 500 Gals 10% HCL; 4810 Bbls Slickwater; 123104 # 40/70 Sand; 8750 # 20/40 Sand; (Summary) | | Total fluid used in treatment (bbls): | 4822 | Max pressure during treatment (psi): | 6358 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 4810 | Total flowback volume recovered (bbls): | 19352 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 131854 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 12196 ft. | # Of Holes: | 30 | | Interval Bottom: | 12468 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OG Status: TA - 7/12/2018 Interval Top: 10080 ft. Interval Bottom: 12800 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 7/19/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/19/2014 | | Treatment Summary: | 4500 Gals 10% HCL; 1571192 Bbls Slickwater; 928793 # 40/70 Sand; 68222 # 20/40 Sand; (Summary) | | Total fluid used in treatment (bbls): | 37515 | Max pressure during treatment (psi): | 6358 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 37408 | Total flowback volume recovered (bbls): | 19352 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 997015 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1079 | | CALC_MCF_GAS | 1295 | | CASING_PRESS | 2172 | | MCF_GAS | 1295 | | TUBING_PRESS | 1631 |
| | Perforation Data: | | Interval Top: | 10080 ft. | # Of Holes: | 215 | | Interval Bottom: | 12800 ft. | Hole Size: | 0.35 in. |
|
Formation WMFK Formation Classification: OG Status: TA - 6/9/2018 Interval Top: 9835 ft. Interval Bottom: 10023 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | WILLIAMS FORK | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WMFK. |
| | Perforation Data: | | Interval Top: | 9835 ft. | # Of Holes: | 8 | | Interval Bottom: | 10023 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 2/1/2021 Interval Top: 9085 ft. Interval Bottom: 9896 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 6/15/2018 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/14/2018 | Treatment End Date: | 6/15/2018 | | Treatment Summary: | 19512 bbls of slickwater; No Proppant; 888 gals of biocide | | Total fluid used in treatment (bbls): | 19531 | Max pressure during treatment (psi): | 6358 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 19512 | Total flowback volume recovered (bbls): | 19522 | | Fresh water used in treatment (bbls): | 21 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/19/2014 | | Treatment Summary: | Gals 3000 10% HCL; 25856 Bbls Slickwater; 644254 # 40/70 Sand; 48847 # 20/40 Sand; (Summary) | | Total fluid used in treatment (bbls): | 25927 | Max pressure during treatment (psi): | 6358 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.61 | | Recycled water used in treatment (bbls): | 25856 | Total flowback volume recovered (bbls): | 19352 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 693101 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9085 ft. | # Of Holes: | 96 | | Interval Bottom: | 9896 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 1 |
| Total Gas Produced (MCF) | 509 |
| GOR | 509000 |
| GOR Determination | MCFE |
| Average BOE per Day | 0.241 |
| Average MCFE per Day | 1.411 |
| Federal Financial Assurance | i | Y |
|
|