|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2023 Measured TD: 12750 ft. Vertical TD: 12740 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | | Expiration Date: | 12/26/2015 | Prop Depth/Form: | 12778 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | Cement: | Sacks: 60, Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3895 ft., Weight: 32.3 , Citings Type: PLANNED | Cement: | Sacks: 1412, Top: 0 ft., Bottom: 3895 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12778 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: 1316, Top: 7708 ft., Bottom: 12778 ft. |
| | |
Wellbore Completed | Completion Date: | 6/25/2014 | Spud Date: | 4/14/2014 | Spud Date Is: | ACTUAL | Measured TD: | 12750 ft. | Measured PB depth: | 12663 ft. | True Vertical TD: | 12740 ft. | True Vertical PB depth: | 12653 ft. | Top PZ Location: | Sec:24 Twp: 1S 98W | Footage: 1864 FSL 1775 FEL | Bottom Hole Location: | Sec:24 Twp: 1S 98W | Footage: 1848 FSL 1787 FEL | Log Types: | CBL, Mud, and Reservoir Performance Monitor (RPM) | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3944 ft., Weight: 36 , Citings Type: ACTUAL | Cement: | Sacks: 810, Top: 1820 ft., Bottom: 3944 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12740 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: 1800, Top: 6575 ft., Bottom: 12740 ft., Determination Method: CBL | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 9.625 in., Top: , Depth: 1820 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1060, Top: 0 ft., Bottom: 1820 ft., Determination Method: VISU | Additional Cement: | String Type: SURF , Top: , Depth: 1750 ft., Bottom: , Sacks: 810, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | WASATCH G | 5827 ft. | | | | MESAVERDE | 7888 ft. | | | | CAMEO | 11012 ft. | | | | ROLLINS | 11537 ft. | | | | COZZETTE | 11674 ft. | | | | CORCORAN | 11891 ft. | | | | SEGO | 12287 ft. | | | |
Formation SEGO Formation Classification: OG Status: SI - 9/1/2023 Interval Top: 12290 ft. Interval Bottom: 12596 ft. Completed Information for Formation SEGO | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | SEGO | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/15/2014 | Treatment Summary: | 1000 Gals 10% HCL; 153039# 40/70 Sand; 11250 20/40# Sand; 6673 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 6697 | Max pressure during treatment (psi): | 4930 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 2 | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.64 | Recycled water used in treatment (bbls): | 6673 | Total flowback volume recovered (bbls): | 13276 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 164289 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SEGO. |
| Perforation Data: | Interval Top: | 12290 ft. | # Of Holes: | 45 | Interval Bottom: | 12596 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OG Status: SI - 9/1/2023 Interval Top: 11923 ft. Interval Bottom: 12211 ft. Completed Information for Formation CORCORAN | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | CORCORAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/15/2014 | Treatment End Date: | 7/15/2014 | Treatment Summary: | 500 Gals 10% HCL; 92457# 40/70 Sand; 6250# 20/40 Sand; 3802 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 3814 | Max pressure during treatment (psi): | 4930 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 1 | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.64 | Recycled water used in treatment (bbls): | 3802 | Total flowback volume recovered (bbls): | 13276 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 98707 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CRCRN. |
| Perforation Data: | Interval Top: | 11923 ft. | # Of Holes: | 23 | Interval Bottom: | 12211 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OG Status: SI - 9/1/2023 Interval Top: 11879 ft. Interval Bottom: 11880 ft. Completed Information for Formation COZZETTE | 1st Production Date: | 7/16/2014 | Choke Size: | | Formation Name: | COZZETTE | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation COZZ. |
| Perforation Data: | Interval Top: | 11879 ft. | # Of Holes: | 3 | Interval Bottom: | 11880 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OG Status: CM - 8/1/2020 Interval Top: 9778 ft. Interval Bottom: 12596 ft. Completed Information for Formation WILLIAMS FORK-ILES | 1st Production Date: | 7/18/2014 | Choke Size: | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/14/2014 | Treatment End Date: | 7/18/2014 | Treatment Summary: | 4500 Gals 10% HCL; 916538# 40/70 Sand; 65000# 20/40 Sand; 36649 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 36756 | Max pressure during treatment (psi): | 4930 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 9 | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.64 | Recycled water used in treatment (bbls): | 36649 | Total flowback volume recovered (bbls): | 13276 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 981538 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BTU_GAS | 1079 | CALC_MCF_GAS | 881 | CASING_PRESS | 1673 | MCF_GAS | 881 | TUBING_PRESS | 1170 |
| Perforation Data: | Interval Top: | 9778 ft. | # Of Holes: | 214 | Interval Bottom: | 12596 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: OG Status: CM - 3/27/2020 Interval Top: 8937 ft. Interval Bottom: 12596 ft. Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | 1st Production Date: | 9/20/2018 | Choke Size: | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12007 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCCCS. |
| Perforation Data: | Interval Top: | 8937 ft. | # Of Holes: | 214 | Interval Bottom: | 12596 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OG Status: SI - 9/1/2023 Interval Top: 8937 ft. Interval Bottom: 11433 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 6/5/2018 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 5/14/2018 | Treatment End Date: | 6/15/2018 | Treatment Summary: | 13038 bbls of slickwater; No Proppant; 535 gals of biocide | Total fluid used in treatment (bbls): | 13051 | Max pressure during treatment (psi): | 7246 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 3 | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.60 | Recycled water used in treatment (bbls): | 13038 | Total flowback volume recovered (bbls): | 5846 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 7/16/2014 | Treatment End Date: | 7/18/2014 | Treatment Summary: | 3000 Gals 10% HCL; 671042# 40/70 Sand; 47500# 20/40 Sand; 26173 Bbls Slickwater; (Summary) | Total fluid used in treatment (bbls): | 26245 | Max pressure during treatment (psi): | 4930 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | Type Of gas: | | Number Of staged intervals: | 6 | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.64 | Recycled water used in treatment (bbls): | 26174 | Total flowback volume recovered (bbls): | 13276 | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | Total proppant used (lbs): | 718542 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCM. |
| Perforation Data: | Interval Top: | 8937 ft. | # Of Holes: | 215 | Interval Bottom: | 11433 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 0.000 |
Average MCFE per Day | 0.000 |
Federal Financial Assurance | i | Y |
|
|