|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/1/2022 Measured TD: 12510 ft. Vertical TD: 12423 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/12/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 2393 FSL 8 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 2387 FSL 20 FEL | | Proposed Depth/Form: | 12559 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | 068239X | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3930 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1305, Top: 0 ft., Bottom: 3930 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12672 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1333, Top: 7576 ft., Bottom: 12672 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/9/2015 | | Spud Date: | 2/28/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 12510 ft. | Measured PB depth: | 12441 ft. | | True Vertical TD: | 12423 ft. | True Vertical PB depth: | 12354 ft. | | Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 2393 FSL 8 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 2387 FSL 20 FEL | | Log Types: | CBL/MUD/RPM/Triple Combo in API 103-11988 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 108 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 40, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3954 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 805, Top: 1868 ft., Bottom: 3954 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12496 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1925, Top: 5357 ft., Bottom: 12496 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1868 ft., Bottom: 1868 ft., Sacks: 1005, Method: DV TOOL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 25 ft., Bottom: 25 ft., Sacks: 4, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5851 ft. | | | | | WILLIAMS FORK | 7799 ft. | | | | | MESAVERDE | 7799 ft. | | | | | CAMEO | 10888 ft. | | | | | ROLLINS | 11458 ft. | | | | | COZZETTE | 11590 ft. | | | | | CORCORAN | 11817 ft. | | | | | SEGO | 12146 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 12264 ft. Interval Bottom: 12374 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/16/2016 | | Treatment Summary: | 2000 Gals 7.5% HCL; 2067 BBLs Slickwater; 14500 40/80 Sand; 39200 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 2115 | Max pressure during treatment (psi): | 4136 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 2067 | Total flowback volume recovered (bbls): | 1037 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 53700 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12264 ft. | # Of Holes: | 24 | | Interval Bottom: | 12374 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 11877 ft. Interval Bottom: 12243 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/16/2016 | | Treatment Summary: | 2744 Gals 7.5% HCL; 5059 BBLs Slickwater; 41800 40/80 Sand; 109500 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 5124 | Max pressure during treatment (psi): | 4136 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 65 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 5059 | Total flowback volume recovered (bbls): | 2161 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 151300 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11877 ft. | # Of Holes: | 48 | | Interval Bottom: | 12243 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCRS Formation Classification: GW Status: CM - 6/1/2016 Interval Top: 9935 ft. Interval Bottom: 12374 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-CORCORAN-SEGO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/16/2016 | Treatment End Date: | 5/18/2016 | | Treatment Summary: | 12540 Gals 7.5% HCL; 32388 BBLs Slickwater; 252765 40/80 Sand; 787600 40/70 Sand; (summary) | | Total fluid used in treatment (bbls): | 32686 | Max pressure during treatment (psi): | 4136 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 11 | | Total acid used in treatment (bbls): | 298 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 32388 | Total flowback volume recovered (bbls): | 13719 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1040365 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12122 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/1/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1093 | | CALC_MCF_GAS | 2685 | | CASING_PRESS | 3340 | | MCF_GAS | 2685 | | TUBING_PRESS | 2265 |
| | Perforation Data: | | Interval Top: | 9935 ft. | # Of Holes: | 264 | | Interval Bottom: | 12374 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 2/1/2022 Interval Top: 9935 ft. Interval Bottom: 11379 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 5/20/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/17/2016 | Treatment End Date: | 5/18/2016 | | Treatment Summary: | 7796 Gals 7.5% HCL; 25261 BBLs Slickwater; 196465 40/80 Sand; 638900 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 25447 | Max pressure during treatment (psi): | 4136 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 186 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 25261 | Total flowback volume recovered (bbls): | 10521 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 835365 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9935 ft. | # Of Holes: | 192 | | Interval Bottom: | 11379 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 140 |
| Total Gas Produced (MCF) | 20600 |
| GOR | 147142 |
| GOR Determination | MCFE |
| Average BOE per Day | 10.128 |
| Average MCFE per Day | 58.742 |
| Federal Financial Assurance | i | Y |
|
|