Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11991
Well Classification: GW Status: PR - 2/1/2022
Well Name/No:FEDERAL #RGU 43-26-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60732
Facility Status:PRStatus Date2/1/2022
FacilityID:433566LocationID:433271
County:RIO BLANCO #103Location:LOT 8 26 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6623 ft.
Basin:PICEANCE BASIN  
Planned Location:2447FNL  897 FELLat/Long: 39.935136 / -108.354550Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.935135 / -108.354550Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/16/2016
End Date: 5/19/2016
Reported: 6/15/2016
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2022             Measured TD: 12510 ft.    Vertical TD: 12423 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/12/2015
Proposed Top PZ Location:Sec:26 Twp: 1S 98W Footage: 2393 FSL  8 FEL
Bottom Hole Location:Sec:26 Twp: 1S 98W Footage: 2387 FSL  20 FEL
Proposed Depth/Form:12559 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:068239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3930 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1305, Top: 0 ft., Bottom: 3930 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12672 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1333, Top: 7576 ft., Bottom: 12672 ft.

Wellbore Completed
Completion Date:5/9/2015
Spud Date:2/28/2015Spud Date Is:ACTUAL
Measured TD:12510 ft.Measured PB depth:12441 ft.
True Vertical TD:12423 ft.True Vertical PB depth:12354 ft.
Top PZ Location:Sec:26 Twp: 1S 98WFootage: 2393 FSL  8 FEL
Bottom Hole Location:Sec:26 Twp: 1S 98WFootage: 2387 FSL  20 FEL
Log Types:CBL/MUD/RPM/Triple Combo in API 103-11988
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 108 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 40, Top: 0 ft., Bottom: 108 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3954 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 805, Top: 1868 ft., Bottom: 3954 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12496 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1925, Top: 5357 ft., Bottom: 12496 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 1868 ft., Bottom: 1868 ft., Sacks: 1005, Method: DV TOOL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 25 ft., Bottom: 25 ft., Sacks: 4, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
WASATCH G5851 ft.
WILLIAMS FORK7799 ft.
MESAVERDE7799 ft.
CAMEO10888 ft.
ROLLINS11458 ft.
COZZETTE11590 ft.
CORCORAN11817 ft.
SEGO12146 ft.

Formation SEGO                     Formation Classification:  OW                     Status:  PR - 2/1/2022                  Interval Top: 12264 ft.    Interval Bottom: 12374 ft.

 Completed Information for Formation SEGO
1st Production Date:5/20/2016Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/16/2016
Treatment Summary:2000 Gals 7.5% HCL; 2067 BBLs Slickwater; 14500 40/80 Sand; 39200 40/70 Sand; (summary)
Total fluid used in treatment (bbls):2115Max pressure during treatment (psi):4136
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):2067Total flowback volume recovered (bbls):1037
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):53700Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:12264 ft.# Of Holes:24
Interval Bottom:12374 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 2/1/2022                  Interval Top: 11877 ft.    Interval Bottom: 12243 ft.

 Completed Information for Formation CORCORAN
1st Production Date:5/20/2016Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/16/2016
Treatment Summary:2744 Gals 7.5% HCL; 5059 BBLs Slickwater; 41800 40/80 Sand; 109500 40/70 Sand; (summary)
Total fluid used in treatment (bbls):5124Max pressure during treatment (psi):4136
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):65Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):5059Total flowback volume recovered (bbls):2161
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):151300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11877 ft.# Of Holes:48
Interval Bottom:12243 ft.Hole Size:0.35 in.

Formation WFCCRS                 Formation Classification:  GW                 Status:  CM - 6/1/2016                  Interval Top: 9935 ft.    Interval Bottom: 12374 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-CORCORAN-SEGO
1st Production Date:5/20/2016Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-CORCORAN-SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/18/2016
Treatment Summary:12540 Gals 7.5% HCL; 32388 BBLs Slickwater; 252765 40/80 Sand; 787600 40/70 Sand; (summary)
Total fluid used in treatment (bbls):32686Max pressure during treatment (psi):4136
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):298Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):32388Total flowback volume recovered (bbls):13719
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1040365Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:12122 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1093
CALC_MCF_GAS 2685
CASING_PRESS 3340
MCF_GAS 2685
TUBING_PRESS 2265
Perforation Data:
Interval Top:9935 ft.# Of Holes:264
Interval Bottom:12374 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 2/1/2022                  Interval Top: 9935 ft.    Interval Bottom: 11379 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/20/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/17/2016Treatment End Date:5/18/2016
Treatment Summary:7796 Gals 7.5% HCL; 25261 BBLs Slickwater; 196465 40/80 Sand; 638900 40/70 Sand; (summary)
Total fluid used in treatment (bbls):25447Max pressure during treatment (psi):4136
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):186Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):25261Total flowback volume recovered (bbls):10521
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):835365Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:9935 ft.# Of Holes:192
Interval Bottom:11379 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)140
Total Gas Produced (MCF)20600
GOR147142
GOR DeterminationMCFE
Average BOE per Day10.128
Average MCFE per Day58.742

 Federal Financial Assurance  i Y

 Tribal Well  i No