Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11983
Well Classification: GW Status: PR - 8/1/2022
Well Name/No:FEDERAL #RGU 313-25-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60733
Facility Status:PRStatus Date8/1/2022
FacilityID:433557LocationID:433271
County:RIO BLANCO #103Location:Lot 8 26 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6623 ft.
Basin:PICEANCE BASIN  
Planned Location:2454FNL  901 FELLat/Long: 39.935118 / -108.354564Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.935118 / -108.354564Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/16/2016
End Date: 5/19/2016
Reported: 6/15/2016
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2022             Measured TD: 12799 ft.    Vertical TD: 12565 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/12/2015
Proposed Top PZ Location:Sec:25 Twp: 1S 98W Footage: 1636 FSL  298 FWL
Bottom Hole Location:Sec:25 Twp: 1S 98W Footage: 1604 FSL  226 FWL
Proposed Depth/Form:12731 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:068239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WFCM , Formation: WILLIAMS FORK - CAMEO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4007 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1333, Top: 0 ft., Bottom: 4007 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12919 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1360, Top: 7696 ft., Bottom: 12919 ft.

Wellbore Completed
Completion Date:4/29/2015
Spud Date:3/9/2015Spud Date Is:ACTUAL
Measured TD:12799 ft.Measured PB depth:12768 ft.
True Vertical TD:12565 ft.True Vertical PB depth:12534 ft.
Top PZ Location:Sec:25 Twp: 1S 98WFootage: 1636 FSL  298 FWL
Bottom Hole Location:Sec:25 Twp: 1S 98WFootage: 1604 FSL  226 FWL
Log Types:CBL/MUD/RPM/Triple Combo in API 103-11988
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 33, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4038 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 815, Top: 1839 ft., Bottom: 4038 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12797 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1915, Top: 7096 ft., Bottom: 12797 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 25 ft., Depth: 1839 ft., Bottom: 1839 ft., Sacks: 835, Method: DV TOOL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 25 ft., Bottom: 25 ft., Sacks: 5, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
WASATCH G5966 ft.
WILLIAMS FORK7938 ft.
MESAVERDE7938 ft.
CAMEO10991 ft.
ROLLINS11588 ft.
COZZETTE11717 ft.
CORCORAN11919 ft.
SEGO12276 ft.

Formation SEGO                     Formation Classification:  OW                     Status:  PR - 8/1/2022                  Interval Top: 12289 ft.    Interval Bottom: 12595 ft.

 Completed Information for Formation SEGO
1st Production Date:5/20/2016Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/16/2016
Treatment Summary:2926 Gals 7.5% HCL; 4927 BBLS Slickwater; 41991 40/80 Sand; 112719 40/70 Sand; (summary)
Total fluid used in treatment (bbls):4996Max pressure during treatment (psi):6474
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):70Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):4926Total flowback volume recovered (bbls):2192
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):154710Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:12289 ft.# Of Holes:42
Interval Bottom:12595 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  OW                   Status:  PR - 8/1/2022                  Interval Top: 11926 ft.    Interval Bottom: 12257 ft.

 Completed Information for Formation CORCORAN
1st Production Date:5/20/2016Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/16/2016
Treatment Summary:1000 Gals 7.5% HCL; 2723 BBLS Slickwater; 23828 40/80 Sand; 63198 40/70 Sand; (summary)
Total fluid used in treatment (bbls):2747Max pressure during treatment (psi):6474
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):2723Total flowback volume recovered (bbls):958
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):87026Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:11926 ft.# Of Holes:27
Interval Bottom:12257 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  OW                     Status:  PR - 8/1/2022                  Interval Top: 11893 ft.    Interval Bottom: 11894 ft.

 Completed Information for Formation COZZETTE
1st Production Date:5/20/2016Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/16/2016
Treatment Summary:389 BBLS Slickwater; 3404 40/80 Sand; 9028 40/70 Sand; (summary)
Total fluid used in treatment (bbls):389Max pressure during treatment (psi):6474
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):389Total flowback volume recovered (bbls):168
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):12432Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:11893 ft.# Of Holes:3
Interval Bottom:11894 ft.Hole Size:0.35 in.

Formation WFCCCS                 Formation Classification:  GW                 Status:  CM - 6/1/2016                  Interval Top: 9952 ft.    Interval Bottom: 12595 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO
1st Production Date:5/20/2016Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2016Treatment End Date:5/19/2016
Treatment Summary:12620 Gals 7.5% HCL; 37859 BBLS Slickwater; 336648 40/80 Sand; 896671 40/70 Sand; (summary)
Total fluid used in treatment (bbls):38159Max pressure during treatment (psi):6474
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:12
Total acid used in treatment (bbls):300Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):37859Total flowback volume recovered (bbls):12437
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1233319Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:12322 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/1/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1117
CALC_MCF_GAS 2919
CASING_PRESS 3315
MCF_GAS 2919
TUBING_PRESS 2240
Perforation Data:
Interval Top:9952 ft.# Of Holes:264
Interval Bottom:12595 ft.Hole Size:0.35 in.

Formation WFCCRS                 Formation Classification:  OW                 Status:  CM - 3/16/2017                 Interval Top: 9952 ft.    Interval Bottom: 12595 ft.

 Completed Information for Formation WILLIAMS FORK-CAMEO-CORCORAN-SEGO
1st Production Date:5/20/2016Choke Size: 
Formation Name:WILLIAMS FORK-CAMEO-CORCORAN-SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:
Treatment Date:3/16/2017Treatment End Date:N/A
Treatment Summary:12620 Gals 7.5% HCL; 39848 BBLs Slickwater; 321400 40/80 Sand; 917028 40/70 Sand; (summary)
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCCRS.
Perforation Data:
Interval Top:9952 ft.# Of Holes:264
Interval Bottom:12595 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/1/2022                  Interval Top: 9952 ft.    Interval Bottom: 11506 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/20/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/17/2016Treatment End Date:5/19/2016
Treatment Summary:8694 Gals 7.5% HCL; 29820 BBLS Slickwater; 267425 40/80 Sand; 711725 40/70 Sand; (summary)
Total fluid used in treatment (bbls):30027Max pressure during treatment (psi):6474
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):207Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):29820Total flowback volume recovered (bbls):9119
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):979150Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:9952 ft.# Of Holes:192
Interval Bottom:11506 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)107
Total Gas Produced (MCF)15706
GOR146785
GOR DeterminationMCFE
Average BOE per Day7.710
Average MCFE per Day44.715

 Federal Financial Assurance  i Y

 Tribal Well  i No