|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/23/2016 Measured TD: 12751 ft. Vertical TD: 12442 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/23/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/12/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 2538 FNL 2207 FWL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 2540 FNL 2127 FWL | | Proposed Depth/Form: | 12566 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Ryan Gulch Unit | Unit Number: | COC068269 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4053 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1319, Top: 0 ft., Bottom: 4053 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12712 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1329, Top: 7697 ft., Bottom: 12712 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/25/2015 | | Spud Date: | 5/29/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 12751 ft. | Measured PB depth: | 12717 ft. | | True Vertical TD: | 12442 ft. | True Vertical PB depth: | 12408 ft. | | Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 2538 FNL 2207 FWL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 2540 FNL 2127 FWL | | Log Types: | CBL/MUD/Triple Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 33, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4073 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 925, Top: 1836 ft., Bottom: 4073 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12745 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1905, Top: 3450 ft., Bottom: 12745 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1836 ft., Bottom: 1836 ft., Sacks: 865, Method: DV TOOL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 20 ft., Bottom: 20 ft., Sacks: 33, Method: 1 INCH | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5959 ft. | | | | | WILLIAMS FORK | 7905 ft. | | | | | MESAVERDE | 7905 ft. | | | | | CAMEO | 10921 ft. | | | | | ROLLINS | 11504 ft. | | | | | COZZETTE | 11635 ft. | | | | | CORCORAN | 11845 ft. | | | | | SEGO | 12234 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 11/17/2016 Interval Top: 12246 ft. Interval Bottom: 12550 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 12/19/2015 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/10/2015 | Treatment End Date: | 12/12/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 23173 BBLs Slickwater; 226538 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 23197 | Max pressure during treatment (psi): | 5138 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 23173 | Total flowback volume recovered (bbls): | 16847 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 226538 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12246 ft. | # Of Holes: | 48 | | Interval Bottom: | 12550 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 11/17/2016 Interval Top: 11845 ft. Interval Bottom: 12212 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 12/19/2015 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/13/2015 | Treatment End Date: | 12/14/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 25024 BBLs Slickwater; 244996 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 25048 | Max pressure during treatment (psi): | 5138 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 25024 | Total flowback volume recovered (bbls): | 15321 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 244996 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11845 ft. | # Of Holes: | 48 | | Interval Bottom: | 12212 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 11/17/2016 Interval Top: 11708 ft. Interval Bottom: 11827 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 12/19/2015 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/26/2015 | Treatment End Date: | 12/27/2015 | | Treatment Summary: | 500 Gals 10% HCL; 11965 BBLs Slickwater; 110292 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 11977 | Max pressure during treatment (psi): | 5138 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 12 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 11965 | Total flowback volume recovered (bbls): | 9763 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 110292 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11708 ft. | # Of Holes: | 24 | | Interval Bottom: | 11827 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 2/23/2016 Interval Top: 9948 ft. Interval Bottom: 12550 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 12/19/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/10/2015 | Treatment End Date: | 1/4/2016 | | Treatment Summary: | 4500 Gals 10% HCL; 157008 BBLs Slickwater; 1537887 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 157115 | Max pressure during treatment (psi): | 5138 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 157008 | Total flowback volume recovered (bbls): | 62574 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1537887 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12027 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/23/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1095 | | CALC_MCF_GAS | 1138 | | CASING_PRESS | 3273 | | MCF_GAS | 1138 | | TUBING_PRESS | 2523 |
| | Perforation Data: | | Interval Top: | 9948 ft. | # Of Holes: | 312 | | Interval Bottom: | 12550 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 11/17/2016 Interval Top: 9948 ft. Interval Bottom: 11451 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 12/19/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 12/28/2015 | Treatment End Date: | 1/4/2016 | | Treatment Summary: | 2000 Gals 10% HCL; 96845 BBLs Slickwater; 956061 40/70 Sand; (summary)
| | Total fluid used in treatment (bbls): | 96893 | Max pressure during treatment (psi): | 5138 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.68 | | Recycled water used in treatment (bbls): | 96845 | Total flowback volume recovered (bbls): | 20643 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 956061 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9948 ft. | # Of Holes: | 192 | | Interval Bottom: | 11451 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 390 |
| Total Gas Produced (MCF) | 57072 |
| GOR | 146338 |
| GOR Determination | MCFE |
| Average BOE per Day | 28.064 |
| Average MCFE per Day | 162.768 |
| Federal Financial Assurance | i | Y |
|
|