|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 1/1/2024 Measured TD: 12748 ft. Vertical TD: 12463 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 1/1/2024 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/12/2015 | | Proposed Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 885 FSL 948 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 885 FSL 948 FEL | | Proposed Depth/Form: | 12659 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Ryan Gulch Unit | Unit Number: | COC068269 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4041 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1348, Top: 0 ft., Bottom: 4041 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 12971 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1366, Top: 7680 ft., Bottom: 12971 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/24/2015 | | Spud Date: | 11/30/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 12748 ft. | Measured PB depth: | 12709 ft. | | True Vertical TD: | 12463 ft. | True Vertical PB depth: | 12424 ft. | | Top PZ Location: | Sec:26 Twp: 1S 98W | Footage: 906 FSL 927 FEL | | Bottom Hole Location: | Sec:26 Twp: 1S 98W | Footage: 885 FSL 948 FEL | | Log Types: | CBL/MUD/RPM/Triple Combo in API 103-11988 | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 4117 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 1848 ft., Bottom: 4117 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 12738 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1970, Top: 5581 ft., Bottom: 12738 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: 0 ft., Depth: 1848 ft., Bottom: 1848 ft., Sacks: 1095, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5924 ft. | | | | | WILLIAMS FORK | 7880 ft. | | | | | MESAVERDE | 7880 ft. | | | | | CAMEO | 10976 ft. | | | | | ROLLINS | 11512 ft. | | | | | COZZETTE | 11640 ft. | | | | | CORCORAN | 11850 ft. | | | | | SEGO | 12268 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 1/1/2024 Interval Top: 12271 ft. Interval Bottom: 12566 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/12/2015 | Treatment End Date: | 9/12/2015 | | Treatment Summary: | 2000 Gals 10% HCL; 23975 BBLs Slickwater; 286249 #40/70 Sand; 16763 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 24023 | Max pressure during treatment (psi): | 7080 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 23975 | Total flowback volume recovered (bbls): | 8431 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 303012 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 12271 ft. | # Of Holes: | 48 | | Interval Bottom: | 12566 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 1/1/2024 Interval Top: 11853 ft. Interval Bottom: 12221 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/12/2015 | Treatment End Date: | 9/12/2015 | | Treatment Summary: | 2000 Gals 10% HCL; 24315 BBLs Slickwater; 294814 #40/70 Sand; 17992 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 24362 | Max pressure during treatment (psi): | 7080 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 24315 | Total flowback volume recovered (bbls): | 8550 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 312806 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11853 ft. | # Of Holes: | 48 | | Interval Bottom: | 12221 ft. | Hole Size: | 0.35 in. |
|
Formation COZZ Formation Classification: OW Status: PR - 1/1/2024 Interval Top: 11733 ft. Interval Bottom: 11841 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 9/21/2015 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2015 | Treatment End Date: | 9/13/2015 | | Treatment Summary: | 1000 Gals 10% HCL; 12624 BBLs Slickwater; 154519 #40/70 Sand; 9425 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 12648 | Max pressure during treatment (psi): | 7080 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 12624 | Total flowback volume recovered (bbls): | 4439 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 163944 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11733 ft. | # Of Holes: | 24 | | Interval Bottom: | 11841 ft. | Hole Size: | 0.35 in. |
|
Formation WFCCCS Formation Classification: GW Status: CM - 11/30/2015 Interval Top: 9140 ft. Interval Bottom: 12566 ft.| Completed Information for Formation WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | | 1st Production Date: | 9/20/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK-CAMEO-COZZETTE-CORCORAN-SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/2/2015 | Treatment End Date: | 9/18/2015 | | Treatment Summary: | 8000 Gals 10% HCL; 215064 BBLs Slickwater; 2017931 #40/70 Sand; 122548 #20/40 Sand: (summary)
| | Total fluid used in treatment (bbls): | 215255 | Max pressure during treatment (psi): | 7080 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 18 | | Total acid used in treatment (bbls): | 191 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 215064 | Total flowback volume recovered (bbls): | 75543 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 2140479 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12037 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2015 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1071 | | CALC_MCF_GAS | 1798 | | CASING_PRESS | 3281 | | MCF_GAS | 1798 | | TUBING_PRESS | 2432 |
| | Perforation Data: | | Interval Top: | 9140 ft. | # Of Holes: | 432 | | Interval Bottom: | 12566 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 1/1/2024 Interval Top: 9140 ft. Interval Bottom: 11457 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/17/2015 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/14/2015 | Treatment End Date: | 9/18/2015 | | Treatment Summary: | 3000 Gals 10% HCL; 154150 BBLs Slickwater; 1282349 #40/70 Sand; 78368 #20/40 Sand; (summary)
| | Total fluid used in treatment (bbls): | 154221 | Max pressure during treatment (psi): | 7080 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 13 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.64 | | Recycled water used in treatment (bbls): | 154150 | Total flowback volume recovered (bbls): | 54123 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1360717 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9140 ft. | # Of Holes: | 312 | | Interval Bottom: | 11457 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 371 |
| Total Gas Produced (MCF) | 53852 |
| GOR | 145153 |
| GOR Determination | MCFE |
| Average BOE per Day | 26.476 |
| Average MCFE per Day | 153.539 |
| Federal Financial Assurance | i | Y |
|
|