|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 7/24/2014 Measured TD: 11963 ft. Vertical TD: 11925 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 7/24/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 3/13/2015 | | Proposed Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 1519 FNL 1943 FWL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 1519 FNL 1943 FWL | | Proposed Depth/Form: | 11977 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Ryan Gulch Unit | Unit Number: | COC068269 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3729 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 1354, Top: 1354 ft., Bottom: 3729 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11977 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 838, Top: 7092 ft., Bottom: 11977 ft. |
| | |
| Wellbore Completed | | Completion Date: | 9/20/2013 | | Spud Date: | 8/3/2013 | Spud Date Is: | ACTUAL | | Measured TD: | 11963 ft. | Measured PB depth: | 11920 ft. | | True Vertical TD: | 11925 ft. | True Vertical PB depth: | 11882 ft. | | Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 1421 FNL 1959 FWL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 1433 FNL 1924 FWL | | Log Types: | RPM/CBL/MUDLOGS
** NOTE: LAS_SENT_TO_COGCC_ BY GTECH_ 10/16/2013 IN PDF FORMAT. | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 3752 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 800, Top: 0 ft., Bottom: 3752 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 11953 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1665, Top: 5290 ft., Bottom: 11953 ft., Determination Method: CBL | | Additional Cement: | String Type: SURF , Top: , Depth: 1661 ft., Bottom: , Sacks: 800, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5306 ft. | | | | | MESAVERDE | 7328 ft. | | | | | CAMEO | 10167 ft. | | | | | CORCORAN | 11150 ft. | | | | | SEGO | 11755 ft. | | | |
Formation SEGO Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 11550 ft. Interval Bottom: 11860 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 10/20/2013 | Choke Size: | | | Formation Name: | SEGO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/17/2013 | Treatment End Date: | 10/17/2013 | | Treatment Summary: | 1000 Gals 10% HCL; 233683# 40/70 Sand: 16250# 20/40 Sand; 8630 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 8653 | Max pressure during treatment (psi): | 5700 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 2 | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 8630 | Total flowback volume recovered (bbls): | 18279 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 249933 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11550 ft. | # Of Holes: | 46 | | Interval Bottom: | 11860 ft. | Hole Size: | 0.35 in. |
|
Formation CRCRN Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 11196 ft. Interval Bottom: 11501 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 10/20/2013 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/18/2013 | Treatment End Date: | 10/18/2013 | | Treatment Summary: | 500 Gals 10% HCL; 141016 # 40/70 Sand: 10000# 20/40 Sand; 5225 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 5236 | Max pressure during treatment (psi): | 5700 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 11 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 5225 | Total flowback volume recovered (bbls): | 18279 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 151016 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11196 ft. | # Of Holes: | 29 | | Interval Bottom: | 11501 ft. | Hole Size: | 0.35 in. |
|
Formation WFCM Formation Classification: OW Status: PR - 7/24/2014 Interval Top: 9358 ft. Interval Bottom: 10706 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/20/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/18/2013 | Treatment End Date: | 10/19/2013 | | Treatment Summary: | 3000 Gals 10% HCL; 472570# 40/70 Sand: 180152# 20/40 Sand; 22838 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 22909 | Max pressure during treatment (psi): | 5700 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 6 | | Total acid used in treatment (bbls): | 71 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 22838 | Total flowback volume recovered (bbls): | 18279 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 652722 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 9358 ft. | # Of Holes: | 141 | | Interval Bottom: | 10706 ft. | Hole Size: | 0.35 in. |
|
Formation WFILS Formation Classification: OW Status: CM - 2/22/2014 Interval Top: 9358 ft. Interval Bottom: 11860 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 10/16/2013 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 10/17/2013 | Treatment End Date: | 10/19/2013 | | Treatment Summary: | 4500 Gals 10% HCL; 847269# 40/70 Sand: 206402# 20/40 Sand; 36693 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 3680 | Max pressure during treatment (psi): | 5700 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 9 | | Total acid used in treatment (bbls): | 107 | Min frac gradient (psi/ft): | 0.70 | | Recycled water used in treatment (bbls): | 36693 | Total flowback volume recovered (bbls): | 18279 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 1053671 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11244 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/22/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1079 | | CALC_MCF_GAS | 1200 | | CASING_PRESS | 1511 | | MCF_GAS | 1200 | | TUBING_PRESS | 1168 |
| | Perforation Data: | | Interval Top: | 9358 ft. | # Of Holes: | 216 | | Interval Bottom: | 11860 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 173 |
| Total Gas Produced (MCF) | 24762 |
| GOR | 143132 |
| GOR Determination | MCFE |
| Average BOE per Day | 12.180 |
| Average MCFE per Day | 70.628 |
| Federal Financial Assurance | i | Y |
|
|