Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11931
Well Classification: GW Status: PA - 6/20/2017
Well Name/No:WRD #23-33R
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC45291
Facility Status:PAStatus Date6/20/2017
FacilityID:429256LocationID:398432
County:RIO BLANCO #103Location:NESW 33 2N97W 6
Field:WHITE RIVER - #92800Elevation:6168 ft.
Planned Location:1925FSL  2187 FWLLat/Long: 40.096553 / -108.284869Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.096553 / -108.284869Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/15/2012
End Date: 11/15/2012
Reported: 5/21/2013
Days to report: 187
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 6/20/2017             Measured TD: 15923 ft.    Vertical TD: 15897 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 6/20/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/11/2014
Prop Depth/Form:15330 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 94 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 4200 ft., Weight: 68 , Citings Type: PLANNED
Cement:Sacks: 2635, Top: 0 ft., Bottom: 4200 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 10200 ft., Weight: 47 , Citings Type: PLANNED
Cement:Sacks: 1575, Top: 3700 ft., Bottom: 10200 ft.
Casing:String Type: 2ND, Hole Size: 8.5 in., Size: 7 in., Top: 10000 ft., Depth: 12800 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 270, Top: 10000 ft., Bottom: 12800 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.5 in., Size: 5 in., Top: 12600 ft., Depth: 15330 ft., Weight: 18 , Citings Type: PLANNED
Cement:Sacks: 185, Top: 12600 ft., Bottom: 15330 ft.

Wellbore Completed
Completion Date:8/3/2012
Spud Date:6/17/2012Spud Date Is:ACTUAL
Measured TD:15923 ft.Measured PB depth:13685 ft.
True Vertical TD:15897 ft.True Vertical PB depth:13637 ft.
Top PZ Location:Sec:33 Twp: 2N 97WFootage: 2614 FNL  2256 FWLDepth
Bottom Hole Location:Sec:33 Twp: 2N 97WFootage: 2445 FNL  2358 FWLDepth
Log Types:LOGGING TOOLS STUCK IN HOLE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 100 ft., Determination Method: CALC
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 4200 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1720, Top: 0 ft., Bottom: 4200 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 10171 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1730, Top: 6450 ft., Bottom: 10171 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 8.5 in., Size: 7 in., Top: 9872 ft., Depth: 13340 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 9870 ft., Bottom: 13340 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 8.5 in., Size: , Top: 13340 ft., Depth: 15923 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: OPEN HOLE , Top: 13685 ft., Depth: , Bottom: 14072 ft., Sacks: 85, Method:
  No formation data to display.

Sidetrack #01             Wellbore Classification: GW             Status: PA - 6/20/2017             Measured TD: 15904 ft.    Vertical TD: 15866 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: GW        PA - 6/20/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/6/2015
Prop Depth/Form:15904 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: FRTR , Formation: FRONTIER , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 94 , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 4200 ft., Weight: 68 , Citings Type: PLANNED
Cement:Sacks: 1720, Top: 0 ft., Bottom: 4200 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 10171 ft., Weight: 53.5 , Citings Type: PLANNED
Cement:Sacks: 1730, Top: 4200 ft., Bottom: 10171 ft.
Casing:String Type: 1ST LINER, Hole Size: 8.5 in., Size: 7 in., Top: 9873 ft., Depth: 13340 ft., Weight: 29 , Citings Type: PLANNED
Cement:Sacks: 450, Top: 9873 ft., Bottom: 13340 ft.
Casing:String Type: 2ND LINER, Hole Size: 6 in., Size: 4.5 in., Top: 12993 ft., Depth: 15904 ft., Weight: 13.5 , Citings Type: PLANNED
Cement:Sacks: 200, Top: 14216 ft., Bottom: 15904 ft.

Wellbore Completed
Completion Date:9/18/2012
Spud Date:6/17/2012Spud Date Is:ACTUAL
Measured TD:15904 ft.Measured PB depth:15904 ft.
True Vertical TD:15866 ft.True Vertical PB depth:15866 ft.
Top PZ Location:Sec:33 Twp: 2N 97WFootage: 2552 FNL  2322 FWLDepth
Bottom Hole Location:Sec:33 Twp: 2N 97WFootage: 2445 FNL  2538 FWLDepth
Log Types:MUD, PEX N-D, PEX AI, SPEC GR, CHV, IS, PEX DOWN LOG, CBL/VDL, CAST-I, CBL
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 100 ft., Weight: 94 , Citings Type: ACTUAL
Cement:Sacks: 9, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 4200 ft., Weight: 68 , Citings Type: ACTUAL
Cement:Sacks: 1720, Top: 0 ft., Bottom: 4200 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 10171 ft., Weight: 53.5 , Citings Type: ACTUAL
Cement:Sacks: 1730, Top: 6450 ft., Bottom: 10171 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: , Size: 4.5 in., Top: 0 ft., Depth: 15904 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 1950, Top: 10940 ft., Bottom: 15904 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 8.5 in., Size: , Top: 9873 ft., Depth: 13340 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 9873 ft., Bottom: 13340 ft., Determination Method: CALC
Casing:String Type: 2ND LINER, Hole Size: 6 in., Size: 4.5 in., Top: 12993 ft., Depth: 15904 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 14216 ft., Bottom: 15904 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
CAMEO6461 ft.NN
LOYD SS8059 ft.NN
NIOBRARA10885 ft.NN
FRONTIER12482 ft.NN
MOWRY12726 ft.NN
DAKOTA12803 ft.NN
ENTRADA13456 ft.NN
CHINLE13977 ft.NN
MOENKOPI14275 ft.NN
WEBER14890 ft.NN

Formation WEBR                     Formation Classification:  OG                     Status:  AB - 5/4/2013                  Interval Top: 14900 ft.    Interval Bottom: 15690 ft.

 Completed Information for Formation WEBER
1st Production Date:11/19/2012Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/5/2012Treatment End Date:11/15/2012
Treatment Summary:There were four frac stages described in attachment. All frac fluid details are a combination of these four stages.
Total fluid used in treatment (bbls):2685Max pressure during treatment (psi):9311
Total gas used in treatment (mcf):10439Fluid density (lbs/gal):3.57
Type Of gas:CARBON DIOXIDENumber Of staged intervals:6
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.53
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):523
Fresh water used in treatment (bbls):2685Disposition method For flowback:DISPOSAL
Total proppant used (lbs):304165Green completions techniques utilized:No
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 355
BBLS_OIL 28
BTU_GAS 1
CALC_BBLS_H2O 355
CALC_BBLS_OIL 28
CALC_GOR 510
CALC_MCF_GAS 1428
CASING_PRESS 350
GRAVITY_OIL 50
MCF_GAS 1428
Perforation Data:
Interval Top:14900 ft.# Of Holes:248
Interval Bottom:15690 ft.Hole Size:0.34 in.

Formation DKTA                     Formation Classification:  OG                     Status:  AB - 7/24/2013                 Interval Top: 12821 ft.    Interval Bottom: 12857 ft.

 Completed Information for Formation DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:DAKOTACommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/12/2013Treatment End Date:6/29/2013
Treatment Summary:6/12/13: 1000 gals 15% HCl acid and bio balls 6/29/13: 2664# 20/40 Carboprop, 932 bbls slickwater
Total fluid used in treatment (bbls):932Max pressure during treatment (psi):8692
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.83
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):525
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):2664Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation DKTA.
Perforation Data:
Interval Top:12821 ft.# Of Holes:67
Interval Bottom:12857 ft.Hole Size:0.43 in.

Formation FRDK                     Formation Classification:  OG                     Status:  AB - 7/24/2013                 Interval Top: 12510 ft.    Interval Bottom: 12857 ft.

 Completed Information for Formation FRONTIER-DAKOTA
1st Production Date:N/AChoke Size: 
Formation Name:FRONTIER-DAKOTACommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/6/2013Test Method:Swab
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 84
CALC_BBLS_H2O 84
CASING_PRESS 1070
Perforation Data:
Interval Top:12510 ft.# Of Holes:156
Interval Bottom:12857 ft.Hole Size:0.43 in.

Formation FRTR                     Formation Classification:  OG                     Status:  AB - 7/24/2013                 Interval Top: 12510 ft.    Interval Bottom: 12601 ft.

 Completed Information for Formation FRONTIER
1st Production Date:N/AChoke Size: 
Formation Name:FRONTIERCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/29/2013Treatment End Date:7/10/2013
Treatment Summary:6/29/13: 36603# 20/40 Carboprop, 4105 bbls slickwater 7/10/13: 2000 gals 28% HCl acid, 985 bbls linear gel
Total fluid used in treatment (bbls):5090Max pressure during treatment (psi):9200
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):1493
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):36603Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FRTR.
Perforation Data:
Interval Top:12510 ft.# Of Holes:89
Interval Bottom:12601 ft.Hole Size:0.43 in.

Formation NBRR                     Formation Classification:  OG                     Status:  AB - 9/9/2013                  Interval Top: 11342 ft.    Interval Bottom: 11998 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/8/2013Treatment End Date:8/29/2013
Treatment Summary:8/8/13: 11908'-11998' - 2000 gals 15% acid, bio-balls 8/29/13: 11342'-11366' - 3000 gals 15% acid, bio-balls
Total fluid used in treatment (bbls):0Max pressure during treatment (psi):6355
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):119Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):119
Fresh water used in treatment (bbls):Disposition method For flowback:DISPOSAL
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/2/2013Test Method:Swab
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 4
BBLS_OIL 1
CALC_BBLS_H2O 4
CALC_BBLS_OIL 1
Perforation Data:
Interval Top:11342 ft.# Of Holes:187
Interval Bottom:11998 ft.Hole Size:0.43 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2023 - September 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No