Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11676
Well Classification: GW Status: PR - 11/6/2012
Well Name/No:Federal RGU #421-25-198
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC060733
Facility Status:PRStatus Date11/6/2012
FacilityID:416825LocationID:416819
County:RIO BLANCO #103Location:NWNE 25 1S98W 6
Field:SULPHUR CREEK - #80090Elevation:6441 ft.
Basin:PICEANCE BASIN  
Planned Location:290FNL  1958 FELLat/Long: 39.940813 / -108.340227Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.940814 / -108.340229Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/21/2011
End Date: 10/21/2011
Reported: 6/10/2012
Prior to rule 205A.b.(2)(A)
Days to report: 233
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/6/2012             Measured TD: 12872 ft.    Vertical TD: 12724 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/6/2012
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/22/2012
Proposed Top PZ Location:Sec:25 Twp: 1S 98W Footage: 981 FNL  1880 FWL
Bottom Hole Location:Sec:25 Twp: 1S 98W Footage: 981 FNL  1880 FWL
Proposed Depth/Form:12886 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Ryan Gulch Unit Unit Number:COC068239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: 527-6 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: 527-6 , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 527-6 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 135, Top: , Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3979 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 3979 ft.
Casing:String Type: 3RD, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12886 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom: 12886 ft.

Wellbore Completed
Completion Date:6/26/2011
Spud Date:6/8/2011Spud Date Is:ACTUAL
Measured TD:12872 ft.Measured PB depth:12872 ft.
True Vertical TD:12724 ft.True Vertical PB depth:12694 ft.
Top PZ Location:Sec:25 Twp: 1S 98WFootage: 941 FNL  1883 FWL
Bottom Hole Location:Sec:25 Twp: 1S 98WFootage: 940 FNL  1859 FWL
Log Types:CBL AND RPM
Log Types:CBL/RPM & MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 4070 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 961, Top: 1843 ft., Bottom: 4070 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12862 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1449, Top: 5670 ft., Bottom: 12862 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 1843 ft., Bottom: 1843 ft., Sacks: 1240, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G5940 ft.
MESAVERDE8009 ft.
CAMEO11095 ft.
ROLLINS11675 ft.
COZZETTE11808 ft.
CORCORAN12035 ft.
SEGO12427 ft.

Formation SEGO                     Formation Classification:  GW                     Status:  PR - 11/1/2013                 Interval Top: 12438 ft.    Interval Bottom: 12757 ft.

 Completed Information for Formation SEGO
1st Production Date:11/5/2011Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/20/2011
Treatment Summary:1714.5 GAL 10% HCL; 265185.5# 30/50 SAND; 24071# 100-MESH SAND; 10513.5 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:12438 ft.# Of Holes:39
Interval Bottom:12757 ft.Hole Size:0.35 in.

Formation CRCRN                   Formation Classification:  GW                   Status:  PR - 11/1/2013                 Interval Top: 12058 ft.    Interval Bottom: 12415 ft.

 Completed Information for Formation CORCORAN
1st Production Date:11/5/2011Choke Size: 
Formation Name:CORCORANCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2011
Treatment Summary:1660.8 GAL 10% HCL; 213102.4# 30/50 SAND; 19267.8# 100-MESH SAND 8536.6 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CRCRN.
Perforation Data:
Interval Top:12058 ft.# Of Holes:35
Interval Bottom:12415 ft.Hole Size:0.35 in.

Formation COZZ                     Formation Classification:  GW                     Status:  PR - 11/6/2012                 Interval Top: 11878 ft.    Interval Bottom: 12027 ft.

 Completed Information for Formation COZZETTE
1st Production Date:11/5/2011Choke Size: 
Formation Name:COZZETTECommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/3/2011
Treatment Summary:625 GAL 10% HCL; 99810# 30/50 SAND; 8895# 100-MESH SAND; 3878.3 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation COZZ.
Perforation Data:
Interval Top:11878 ft.# Of Holes:15
Interval Bottom:12027 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/1/2012                  Interval Top: 9330 ft.    Interval Bottom: 11615 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/5/2011Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/7/2011
Treatment Summary:9000 GAL 10% HCL; 1346409# 30/50 SAND; 120815# 100-MESH SAND; 52513.4 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:9330 ft.# Of Holes:201
Interval Bottom:11615 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 2/11/2012                 Interval Top: 9330 ft.    Interval Bottom: 12757 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:11/5/2011Choke Size: 
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/20/2011
Treatment Summary:13000.3 GAL 10% HCL; 1924506.9# 30/50 SAND; 173048.8# 100-MESH SAND; 75441.9 BBLS SLICKWATER
Tubing Size:2.375 in.Tubing Setting Depth:11585 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/11/2012Test Method:flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1105
CALC_MCF_GAS 1013
CASING_PRESS 2354
MCF_GAS 1013
TUBING_PRESS 1768
Perforation Data:
Interval Top:9330 ft.# Of Holes:290
Interval Bottom:12757 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)179
Total Gas Produced (MCF)24904
GOR139128
GOR DeterminationMCFE
Average BOE per Day12.106
Average MCFE per Day70.238

 Federal Financial Assurance  i Y

 Tribal Well  i No