Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11464
Well Classification: ERIW Status: IJ - 5/1/2023
Well Name/No:UNION PACIFIC #153X16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date5/1/2023
FacilityID:301659LocationID:398839
County:RIO BLANCO #103Location:NWSW 16 2N102W 6
Field:RANGELY - #72370Elevation:5363 ft.
Planned Location:2048FSL  189 FWLLat/Long: 40.141408 / -108.857053Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.141459 / -108.857151Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: AB - 11/27/2017             Measured TD: 5221 ft.    Vertical TD: 5050 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        AB - 11/27/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2012
Prop Depth/Form:6575 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 2000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 789, Top: 0 ft., Bottom: 2000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 6383 ft., Weight: 23# , Citings Type: PLANNED
Cement:Sacks: 678, Top: 0 ft., Bottom: 6383 ft.

Wellbore Completed
Completion Date:7/20/2011
Spud Date:7/25/2011Spud Date Is:ACTUAL
Measured TD:5221 ft.Measured PB depth:5169 ft.
True Vertical TD:5050 ft.True Vertical PB depth:4998 ft.
Top PZ Location:Sec:16 Twp: 2N 102WFootage: 1211 FSL  628 FWLDepth
Bottom Hole Location:Sec:16 Twp: 2N 102WFootage: 1211 FSL  628 FWLDepth
Log Types:NONE.
Log Types:NO LOGS RUN (YET)
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: , Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2001 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 2001 ft., Determination Method: VISU
Additional Cement:String Type: OPEN HOLE , Top: 2280 ft., Depth: -2280 ft., Bottom: 4500 ft., Sacks: 550, Method:
FormationInterval TopLog BottomCoredDSTs
CARMEL
CHINLE
CURTIS
NAVAJO
SHINARUMP
WEBER
MOENKOPI
DAKOTA3845 ft.
MORRISON3919 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  AB - 7/25/2011

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
No Perforation Data was found for formation WEBR.

Sidetrack #01             Wellbore Classification: ERIW             Status: IJ - 5/1/2023             Measured TD: 6565 ft.    Vertical TD: 6331 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: ERIW        IJ - 5/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/20/2013
Prop Depth/Form:6575 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:Not availableSurface Owner:FEE
Unit:RANGELY WEBER Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2000 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 495, Top: 0 ft., Bottom: 2001 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6383 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 678, Top: 0 ft., Bottom: 6383 ft.

Wellbore Completed
Completion Date:8/17/2011
Spud Date:7/15/2011Spud Date Is:ACTUAL
Measured TD:6565 ft.Measured PB depth:6565 ft.
True Vertical TD:6331 ft.True Vertical PB depth:6331 ft.
Top PZ Location:Sec:16 Twp: 2N 102WFootage: 900 FSL  720 FWLDepth
Bottom Hole Location:Sec:16 Twp: 2N 102WFootage: 872 FSL  736 FWLDepth
Log Types:ACUSTIC CBL, CIRCUMFERENTIAL SCANNING, TRIPLE COMBO
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: , Top: 0 ft., Depth: 60 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2001 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 495, Top: 0 ft., Bottom: 495 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6539 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1315, Top: 0 ft., Bottom: 4000 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: , Depth: 4500 ft., Bottom: 4500 ft., Sacks: 275, Method: STAGE TOOL
Additional Cement:String Type: 1ST , Top: 2280 ft., Depth: 3547 ft., Bottom: 3547 ft., Sacks: 275, Method: STAGE TOOL
FormationInterval TopLog BottomCoredDSTs
WEBER6573 ft.6775 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/1/2023                  Interval Top: 6539 ft.    Interval Bottom: 6780 ft.

 Completed Information for Formation WEBER
1st Production Date:5/1/2012Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/25/2022Treatment End Date:10/25/2022
Treatment Summary:Pull packers and tubing, clean out open hole to 6775 ft. Acid job, run packers and new FL tubing. Return to injection pending approval of the Form 21. Witness test scheduled. Pumped 2500 Gallons (59.5 bbl.) 15% HCL w/ additives and inhibitor and 45 bbl. water. NOTE: Change to correct bottom interval per attached wellbore diagram. Drilled to 6780 during the initial completion in 2011.
Total fluid used in treatment (bbls):104Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):59Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/13/2022Treatment End Date:1/13/2022
Treatment Summary:PUMPED 1000 GALLONS (23.8 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 75 BBLS OF FRESH WATER
Total fluid used in treatment (bbls):99Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):75Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/31/2020Treatment End Date:3/31/2020
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 39 BBLS OF FRESH WATER
Total fluid used in treatment (bbls):138Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):39Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/19/2019Treatment End Date:2/19/2019
Treatment Summary:Pumped 2000 gallons 15% Hcl with 110 gallons solvent, 112 bbls fresh water
Total fluid used in treatment (bbls):162Max pressure during treatment (psi):2255
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):112Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:11/20/2017Treatment End Date:N/A
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AND 140 BBLS WATER
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:4/20/2016Treatment End Date:N/A
Treatment Summary:Pumped 110 gallons solvent, 2000 gallons 15% HCl and 170 bbls water
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6520 ft.
Tubing Packer Depth:6433 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6539 ft.# Of Holes:
Interval Bottom:6780 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)218811
GOR
GOR DeterminationMCFE
Average BOE per Day102.808
Average MCFE per Day596.289

 Federal Financial Assurance  i 

 Tribal Well  i No