|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2023 Measured TD: 12830 ft. Vertical TD: 12792 ft. Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2023 | Wellbore Permit | DIRECTIONAL | Permit #: | 20088085 | Expiration Date: | 2/12/2010 | Prop Depth/Form: | 12794 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | Unit: | RYAN GULCH UNIT | Unit Number: | COC068239X | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft. | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3912 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: , Top: 0 ft., Bottom: 3912 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12794 ft., Weight: 11.6 , Citings Type: PLANNED | Cement: | Sacks: , Top: , Bottom: |
| | |
Wellbore Completed | Completion Date: | 1/16/2010 | Spud Date: | 11/23/2009 | Spud Date Is: | ACTUAL | Measured TD: | 12830 ft. | Measured PB depth: | 12797 ft. | True Vertical TD: | 12792 ft. | True Vertical PB depth: | 12759 ft. | Top PZ Location: | Sec:24 Twp: 1S 98W | Footage: 2391 FNL 1882 FEL | Depth | Bottom Hole Location: | Sec:24 Twp: 1S 98W | Footage: 2392 FNL 1903 FEL | Depth | Log Types: | CBL, HRI, SPECTRAL DENSITY, DUAL SPACED NEUTRON, RPM, MUD | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3912 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 3315, Top: 0 ft., Bottom: 3912 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12821 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 1529, Top: 5150 ft., Bottom: 12821 ft., Determination Method: CBL | Additional Cement: | String Type: SURF , Top: 1700 ft., Depth: 1821 ft., Bottom: 1821 ft., Sacks: 50, Method: DV TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | MESAVERDE | 7937 ft. | | N | N | CAMEO | 11205 ft. | | N | N | ROLLINS | 11622 ft. | | N | N | COZZETTE | 11761 ft. | | N | N | CORCORAN | 11964 ft. | | N | N | SEGO | 12356 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: PR - 9/1/2023 Interval Top: 12358 ft. Interval Bottom: 12768 ft. Completed Information for Formation SEGO | 1st Production Date: | 3/31/2010 | Choke Size: | | Formation Name: | SEGO | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/31/2010 | Treatment Summary: | 1747 GAL 10% HCI ACID, 301,300# 100 MESH AND 30/50 SAND, 10,961 BBLS SLICKWATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation SEGO. |
| Perforation Data: | Interval Top: | 12358 ft. | # Of Holes: | 39 | Interval Bottom: | 12768 ft. | Hole Size: | 0.36 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 9/1/2023 Interval Top: 12008 ft. Interval Bottom: 12293 ft. Completed Information for Formation CORCORAN | 1st Production Date: | 4/5/2010 | Choke Size: | | Formation Name: | CORCORAN | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/5/2010 | Treatment Summary: | 1,491 GAL 10% HCI ACIS, 213,900# 100 MESH AND 30/50 SAND, 8,235 BBLS SLICKWATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation CRCRN. |
| Perforation Data: | Interval Top: | 12008 ft. | # Of Holes: | 29 | Interval Bottom: | 12293 ft. | Hole Size: | 0.36 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 9/1/2023 Interval Top: 9625 ft. Interval Bottom: 11524 ft. Completed Information for Formation WILLIAMS FORK - CAMEO | 1st Production Date: | 4/7/2010 | Choke Size: | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 4/7/2010 | Treatment Summary: | 6712 GAL 10% HCI ACID, 1041035# 100 MESH AND 30/50 SABD, 42308 BBLS SLICKWATER. |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WFCM. |
| Perforation Data: | Interval Top: | 9625 ft. | # Of Holes: | 166 | Interval Bottom: | 11524 ft. | Hole Size: | 0.36 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 5/7/2010 Interval Top: 9625 ft. Interval Bottom: 12768 ft. Completed Information for Formation WILLIAMS FORK-ILES | 1st Production Date: | 3/31/2010 | Choke Size: | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/31/2010 | Treatment Summary: | 9950 GAL 10% HCI ACID, 1556235# 100 MESH AND 30/50 SAND, 61,504 BBLS SLICKWATER. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 12626 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/7/2010 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | DRY | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1090 | CASING_PRESS | 3450 | MCF_GAS | 2600 | TUBING_PRESS | 3025 |
| Perforation Data: | Interval Top: | 9625 ft. | # Of Holes: | 234 | Interval Bottom: | 12768 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 312 |
Total Gas Produced (MCF) | 39578 |
GOR | 126852 |
GOR Determination | MCFE |
Average BOE per Day | 19.491 |
Average MCFE per Day | 113.082 |
Federal Financial Assurance | i | Y |
|
|