|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 2/23/2011 Measured TD: 12134 ft. Vertical TD: 11992 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 2/23/2011 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20084540 | Expiration Date: | 9/10/2009 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 2343 FSL 1909 FEL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 2343 FSL 1909 FEL | | Proposed Depth/Form: | 12050 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | RYAN GULCH UNIT | Unit Number: | COC68239 | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: , Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: , Depth: 3800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: , Top: 0 ft., Bottom: 3800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: , Depth: 12050 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 875, Top: 200 ft., Bottom: 12050 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/8/2009 | | Spud Date: | 4/18/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 12134 ft. | Measured PB depth: | 12031 ft. | | True Vertical TD: | 11992 ft. | True Vertical PB depth: | 11889 ft. | | Top PZ Location: | Sec:27 Twp: 1S 98W | Footage: 2340 FSL 1900 FEL | | Bottom Hole Location: | Sec:27 Twp: 1S 98W | Footage: 2355 FSL 1921 FEL | | Log Types: | CBL, RMTE, DUAL SPACED NEUTRON LAS PAPER RECEIVED 02/23/2011 | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 48 ft., Depth: 80 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 135, Top: 0 ft., Bottom: 80 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3828 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1691, Top: 0 ft., Bottom: 3828 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 12119 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1436, Top: 3800 ft., Bottom: 12119 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 7429 ft. | | | | | CAMEO | 10519 ft. | | | | | ROLLINS | 10927 ft. | | | | | COZZETTE | 11060 ft. | | | | | CORCORAN | 11268 ft. | | | | | SEGO | 11620 ft. | | | |
Formation SEGO Formation Classification: GW Status: PR - 9/1/2012 Interval Top: 11627 ft. Interval Bottom: 11966 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 6/29/2009 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/29/2009 | | Treatment Summary: | 2252 GAL 10% HCL ACID, 265900# 100 MESH AND 30/50 SAND, 9676 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 11627 ft. | # Of Holes: | 54 | | Interval Bottom: | 11966 ft. | Hole Size: | 0.36 in. |
|
Formation CRCRN Formation Classification: GW Status: PR - 9/1/2012 Interval Top: 11398 ft. Interval Bottom: 11490 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 7/3/2009 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/3/2009 | | Treatment Summary: | 752 GAL 10% HCL ACID, 140600# 100 MESH AND 30/50 SAND, 4796 BBLS SLICKWATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 11398 ft. | # Of Holes: | 18 | | Interval Bottom: | 11490 ft. | Hole Size: | 0.36 in. |
|
Formation COZZ Formation Classification: GW Status: PR - 9/1/2012 Interval Top: 11181 ft. Interval Bottom: 11366 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 7/7/2009 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/7/2009 | | Treatment Summary: | 750 GAL 10% HCL ACID, 88200# 100 MESH AND 30/50 SAND, 3237 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation COZZ. |
| | Perforation Data: | | Interval Top: | 11181 ft. | # Of Holes: | 21 | | Interval Bottom: | 11366 ft. | Hole Size: | 0.36 in. |
|
Formation WFCM Formation Classification: GW Status: PR - 9/1/2012 Interval Top: 8714 ft. Interval Bottom: 10865 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 7/9/2009 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/9/2009 | | Treatment Summary: | 10000 GAL 10% HCL ACID, 1177250# 100 MESH AND 30/50 SAND, 45036 BBLS SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WFCM. |
| | Perforation Data: | | Interval Top: | 8714 ft. | # Of Holes: | 259 | | Interval Bottom: | 10865 ft. | Hole Size: | 0.36 in. |
|
Formation WFILS Formation Classification: GW Status: CM - 8/14/2009 Interval Top: 8714 ft. Interval Bottom: 11966 ft.| Completed Information for Formation WILLIAMS FORK-ILES | | 1st Production Date: | 6/29/2009 | Choke Size: | | | Formation Name: | WILLIAMS FORK-ILES | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/29/2009 | | Treatment Summary: | 13754 GAL 10% HCL ACID, 1671950# 100 MESH AND 30/50 SAND, 62745 BBLS SLICKWATER. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 11863 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/14/2009 | Test Method: | flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1100 | | CASING_PRESS | 3075 | | MCF_GAS | 2500 | | TUBING_PRESS | 2100 |
| | Perforation Data: | | Interval Top: | 8714 ft. | # Of Holes: | 352 | | Interval Bottom: | 11966 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 157 |
| Total Gas Produced (MCF) | 22735 |
| GOR | 144808 |
| GOR Determination | MCFE |
| Average BOE per Day | 11.179 |
| Average MCFE per Day | 64.834 |
| Federal Financial Assurance | i | Y |
|
|