|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2025 Measured TD: 12427 ft. Vertical TD: 12301 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20073054 | Expiration Date: | 8/2/2008 | | Proposed Top PZ Location: | Sec:2 Twp: 1S 98W | Footage: 2812 FNL 1978 FWL | | Bottom Hole Location: | Sec:2 Twp: 1S 98W | Footage: 2812 FNL 1978 FWL | | Proposed Depth/Form: | 12301 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: CSLGT , Formation: CASTLEGATE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: RLNS , Formation: ROLLINS , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 8/2/2008 | | Spud Date: | 9/19/2007 | Spud Date Is: | ACTUAL | | Measured TD: | 12427 ft. | Measured PB depth: | 11808 ft. | | True Vertical TD: | 12301 ft. | True Vertical PB depth: | 11682 ft. | | Top PZ Location: | Sec:2 Twp: 1S 98W | Footage: 2812 FNL 1978 FWL | | Bottom Hole Location: | Sec:2 Twp: 1S 98W | Footage: 2812 FNL 1978 FWL | | Log Types: | CBL, TRIP COMBO, RMTE, MUD | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 20 in., Top: 0 ft., Depth: 60 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 131, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3409 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 830, Top: 1313 ft., Bottom: 3409 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11835 ft., Weight: 11.60 , Citings Type: ACTUAL | | Cement: | Sacks: 960, Top: 8300 ft., Bottom: 11835 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.2, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7307 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 590, Top: 2874 ft., Bottom: 7307 ft., Determination Method: CBL | | Casing: | String Type: STAGE TOOL, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1313 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 620, Top: 0 ft., Bottom: 1313 ft., Determination Method: VISU | | Additional Cement: | String Type: 1ST , Top: , Depth: 165 ft., Bottom: , Sacks: 80, Method: TOP OUT | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 6617 ft. | | N | N | | ROLLINS | 10430 ft. | | N | N | | COZZETTE | 10537 ft. | | N | N | | CORCORAN | 10785 ft. | | N | N | | SEGO | 11349 ft. | | N | N |
Formation SEGO Formation Classification: GW Status: AB - 11/30/2009 Interval Top: 11357 ft. Interval Bottom: 11720 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 9/15/2008 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/24/2008 | | Treatment Summary: | CIBP SET @ 11,300' W/ 2 SKX CMNT. THERFORE PLUGGING THE SEGO PERFS FROM 11,357 - 11,720. NO CEMENT SQUEEZE WAS PERFORMED. // 1,008 GAL 7 1/2% HCL, 68,423 LBS OF 40/70 ECONOPROP, 5,382 BBLS OF SLICKWATER | | Formation Treatment | | Treatment Date: | 9/13/2008 | | Treatment Summary: | 1,008 GAL 7 1/2% HCL, 51,902 LBS OF 30/60 MESH SINTERLITE SAND, 3,246 5 BBLS OF SLICK WATER |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 456 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 456 | | CALC_MCF_GAS | 1100 | | CASING_PRESS | 1520 | | MCF_GAS | 1100 |
| | Perforation Data: | | Interval Top: | 11357 ft. | # Of Holes: | 18 | | Interval Bottom: | 11720 ft. | Hole Size: | |
|
Formation CRCRN Formation Classification: GW Status: SI - 8/1/2021 Interval Top: 10798 ft. Interval Bottom: 11257 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 12/13/2008 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/5/2008 | | Treatment Summary: | 3,486 GAL 7 1/2 % HCL, 251,500 LBS. OF 30/50 TEMPERED LC, 13,356 BBLS. OF SLICKWATER. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 576 | | BTU_GAS | 1170 | | CALC_BBLS_H2O | 576 | | CALC_MCF_GAS | 1480 | | CASING_PRESS | 2050 | | MCF_GAS | 1480 |
| | Perforation Data: | | Interval Top: | 10798 ft. | # Of Holes: | 69 | | Interval Bottom: | 11257 ft. | Hole Size: | 0.34 in. |
|
Formation COZZ Formation Classification: GW Status: SI - 9/1/2025 Interval Top: 10564 ft. Interval Bottom: 10575 ft.| Completed Information for Formation COZZETTE | | 1st Production Date: | 10/8/2010 | Choke Size: | | | Formation Name: | COZZETTE | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2010 | | Treatment Summary: | 296 bbls. slickwater; 4,900 lbs. 30/50 Prime Plus RCS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1030 | | CALC_MCF_GAS | 5 | | CASING_PRESS | 1408 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 10564 ft. | # Of Holes: | 6 | | Interval Bottom: | 10575 ft. | Hole Size: | 0.36 in. |
|
Formation RLNS Formation Classification: GW Status: SI - 9/1/2025 Interval Top: 10440 ft. Interval Bottom: 10533 ft.| Completed Information for Formation ROLLINS | | 1st Production Date: | 10/8/2010 | Choke Size: | | | Formation Name: | ROLLINS | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2010 | | Treatment Summary: | 5,612 bbls. slickwater; 93,107 lbs. 30/50 Prime Plus RCS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1030 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 1408 | | MCF_GAS | 96 |
| | Perforation Data: | | Interval Top: | 10440 ft. | # Of Holes: | 27 | | Interval Bottom: | 10533 ft. | Hole Size: | 0.36 in. |
|
Formation WFCM Formation Classification: GW Status: SI - 9/1/2025 Interval Top: 8799 ft. Interval Bottom: 10362 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 10/8/2010 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2010 | | Treatment Summary: | 26,675 bbls. slickwater; 88 bbls. 7.5% HCL; 478,781 lbs. 30/50 Prime Plus RCS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1030 | | CALC_MCF_GAS | 911 | | CASING_PRESS | 1408 | | MCF_GAS | 911 |
| | Perforation Data: | | Interval Top: | 8799 ft. | # Of Holes: | 150 | | Interval Bottom: | 10362 ft. | Hole Size: | 0.36 in. |
|
Formation WMRCM Formation Classification: GW Status: CM - 10/10/2010 Interval Top: 8799 ft. Interval Bottom: 10575 ft.| Completed Information for Formation WILLIAMS FK-ROLLINS-CAMEO | | 1st Production Date: | 10/8/2010 | Choke Size: | | | Formation Name: | WILLIAMS FK-ROLLINS-CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 10/4/2010 | | Treatment Summary: | 32,583 bbls. slickwater; 88 bbls. 7.5% HCL; 24 bbls. 15% HCL; 576,788 lbs. of 30/50 Prime Plus RCS |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/10/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1030 | | CALC_MCF_GAS | 1012 | | CASING_PRESS | 1408 | | MCF_GAS | 1012 |
| | Perforation Data: | | Interval Top: | 8799 ft. | # Of Holes: | 183 | | Interval Bottom: | 10575 ft. | Hole Size: | 0.36 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 12/2024 - 11/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 10 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.006 |
| Average MCFE per Day | 0.028 |
| Federal Financial Assurance | i | Y |
|
|