Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-11026
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:FEDERAL RGU #32-1-298
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC60736
Facility Status:SIStatus Date10/1/2025
FacilityID:290890LocationID:335640
County:RIO BLANCO #103Location:SESE 1 2S98W 6
Field:SULPHUR CREEK - #80090Elevation:6282 ft.
Basin:PICEANCE BASIN  
Planned Location:780FSL  786 FELLat/Long: 39.901005 / -108.336215Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.901005 / -108.336215Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 11940 ft.    Vertical TD: 11652 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #:20072076 Expiration Date:6/3/2008
Proposed Top PZ Location:Sec:1 Twp: 2S 98W Footage: 2662 FSL  1920 FEL
Bottom Hole Location:Sec:1 Twp: 2S 98W Footage: 2662 FSL  1920 FEL
Proposed Depth/Form:12111 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RYAN GULCH UNIT Unit Number:COC68239X
Formation And Spacing:Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/19/2008
Spud Date:12/9/2007Spud Date Is:ACTUAL
Measured TD:11940 ft.Measured PB depth:11900 ft.
True Vertical TD:11652 ft.True Vertical PB depth:11612 ft.
Top PZ Location:Sec:1 Twp: 2S 98WFootage: 2662 FSL  1920 FEL
Bottom Hole Location:Sec:1 Twp: 2S 98WFootage: 2662 FSL  1920 FEL
Log Types:CBL; HIGH RES.INDUCTION, SPECTRAL DENSITY, DUAL SPACED NEUTRON; MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 19 in., Top: , Depth: 80 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 135, Top: 0 ft., Bottom: 60 ft., Determination Method:
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3369 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1350, Top: 0 ft., Bottom: 3369 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 11945 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 1861, Top: 1650 ft., Bottom: 11945 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE6996 ft.NN
COZZETTE10073 ft.NN
CAMEO10490 ft.NN
ROLLINS10932 ft.NN
SEGO11258 ft.NN

Formation SEGO                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 11659 ft.    Interval Bottom: 11834 ft.

 Completed Information for Formation SEGO
1st Production Date:3/22/2008Choke Size: 
Formation Name:SEGOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/18/2008
Treatment Summary:750 GALS 10% HCI ACID; 71,000# 30/50 SAND; 2523 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SEGO.
Perforation Data:
Interval Top:11659 ft.# Of Holes:18
Interval Bottom:11834 ft.Hole Size:0.35 in.

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 7904 ft.    Interval Bottom: 10853 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:3/22/2008Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/21/2008
Treatment Summary:8000 GALS 10% HCI ACID; 779,400# 30/50 SAND; 25,426 BBLS SLICKWATER
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WFCM.
Perforation Data:
Interval Top:7904 ft.# Of Holes:177
Interval Bottom:10853 ft.Hole Size:0.35 in.

Formation WFILS                   Formation Classification:  GW                   Status:  CM - 4/16/2008                 Interval Top: 7904 ft.    Interval Bottom: 11834 ft.

 Completed Information for Formation WILLIAMS FORK-ILES
1st Production Date:3/22/2008Choke Size:0.375 in.
Formation Name:WILLIAMS FORK-ILESCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/18/2008
Treatment Summary:** FORMATION IS WILLIAMS FORK-ILES-CAMEO** 8750 GALS 10% HCI ACID; 850,400# 30/50 SAND; 27,949 BBLS SLICKWATER.
Tubing Size:3.875 in.Tubing Setting Depth:11740 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/16/2008Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1170
CALC_MCF_GAS 2600
CASING_PRESS 2400
MCF_GAS 2600
TUBING_PRESS 1500
Perforation Data:
Interval Top:7904 ft.# Of Holes:195
Interval Bottom:11834 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)12292
GOR201508
GOR DeterminationMCFE
Average BOE per Day5.994
Average MCFE per Day34.768

 Federal Financial Assurance  i Y

 Tribal Well  i No