|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 6/1/2025 Measured TD: 12468 ft. Vertical TD: 12190 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 6/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20083198 | Expiration Date: | 6/16/2009 | | Proposed Top PZ Location: | Sec:10 Twp: 2S 97W | Footage: 186 FSL 2420 FWL | | Bottom Hole Location: | Sec:10 Twp: 2S 97W | Footage: 186 FSL 2420 FWL | | Proposed Depth/Form: | 14000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE CREEK | Unit Number: | COC47666X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 4/20/2009 | | Spud Date: | 8/6/2008 | Spud Date Is: | ACTUAL | | Measured TD: | 12468 ft. | Measured PB depth: | 12366 ft. | | True Vertical TD: | 12190 ft. | True Vertical PB depth: | 12087 ft. | | Top PZ Location: | Sec:10 Twp: 2S 97W | Footage: 186 FSL 2420 FWL | | Bottom Hole Location: | Sec:10 Twp: 2S 97W | Footage: 186 FSL 2420 FWL | | Log Types: | | | Log Types: | MUD-5, AIL, HOLE VOL, DEN, GASVIEW, SONIC, RPM, MSS, RA BOND, DRILL MECH, IMAGING | | Log Types: | | | Log Types: | MUD LOGS, DIRECTIONAL, COMPACT WELL SHUTTLE ARRAY INDUCT. - HOLE VOLUME - COMP. PHOTO DENSITY, GASVIEW, DENSITY - COMP. SONIC, MSS MONOPOLE SEMBLANCE, RMP, RA BOND LOG, PERFORM DRILLING MECHANICS, IMAGING BEHIND CASING ULTRASONIC | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 118 ft., Weight: 60 , Citings Type: ACTUAL | | Cement: | Sacks: 96, Top: 0 ft., Bottom: 118 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 3828 ft., Weight: 45.5 , Citings Type: ACTUAL | | Cement: | Sacks: 1190, Top: 1173 ft., Bottom: 3828 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: , Top: 0 ft., Depth: 8437 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: 760, Top: 3287 ft., Bottom: 8437 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1173 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 840, Top: 0 ft., Bottom: 1173 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: 0 ft., Depth: 12440 ft., Weight: 15.1 , Citings Type: ACTUAL | | Cement: | Sacks: 895, Top: 5683 ft., Bottom: 12440 ft., Determination Method: CBL | | Casing: | String Type: 3RD, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CALC | | Casing: | String Type: STAGE TOOL, Hole Size: , Size: 10.75 in., Top: , Depth: 1173 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 840, Top: 0 ft., Bottom: 1173 ft., Determination Method: VISU | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5397 ft. | 7097 ft. | N | N | | OHIO CREEK | 7097 ft. | 7170 ft. | N | N | | WILLIAMS FORK - CAMEO | 7170 ft. | 11135 ft. | N | N | | ROLLINS | 11135 ft. | 11282 ft. | N | N | | COZZETTE | 11282 ft. | 11601 ft. | N | N | | CORCORAN | 11601 ft. | 12468 ft. | N | N |
Formation WFCM Formation Classification: GW Status: SI - 6/1/2025 Interval Top: 8920 ft. Interval Bottom: 11007 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/20/2009 | Choke Size: | 0.250 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 9/16/2009 | | Treatment Summary: | FRAC WITH 1040500# PROPPANT (188800# 100 MESH AND 851700# 40/70). FRAC PLUGS @ 10777, 10495 AND 9660. DO ALL PLUGS. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9957 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/5/2009 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1047 | | CALC_BBLS_H2O | 2787 | | CALC_MCF_GAS | 2771 | | CASING_PRESS | 2738 | | GRAVITY_OIL | 52 |
| | Perforation Data: | | Interval Top: | 8920 ft. | # Of Holes: | 416 | | Interval Bottom: | 11007 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 17957 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 8.517 |
| Average MCFE per Day | 49.401 |
| Federal Financial Assurance | i | Y |
|
|