|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 12/1/2025 Measured TD: 9680 ft. Vertical TD: 9225 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 12/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060736 | Expiration Date: | 4/10/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 990 FNL 2310 FWL | | Bottom Hole Location: | Sec:16 Twp: 4S 98W | Footage: 990 FNL 2310 FWL | | Proposed Depth/Form: | 10140 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | FIGURE FOUR UNI | Unit Number: | C 66492A | | Formation And Spacing: | Code: ILES , Formation: ILES , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 6/12/2006 | | Spud Date: | 5/22/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 9680 ft. | Measured PB depth: | 9637 ft. | | True Vertical TD: | 9225 ft. | True Vertical PB depth: | | | Top PZ Location: | Sec:16 Twp: 4S 98W | Footage: 991 FNL 2502 FWL | | Bottom Hole Location: | Sec:16 Twp: 4S 98W | Footage: 991 FNL 2502 FWL | | Log Types: | 4-CBL; MUDLOG | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 118 ft., Weight: 57.6 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 118 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 3050 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 827, Top: 914 ft., Bottom: 3050 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 6.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9665 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 711, Top: 4975 ft., Bottom: 9665 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 914 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 935, Top: 0 ft., Bottom: 914 ft., Determination Method: CALC | | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: 4975 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 384, Top: 2550 ft., Bottom: 4975 ft., Determination Method: CALC | | Casing: | String Type: S.C. 2.1, Hole Size: , Size: , Top: , Depth: 6550 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 101, Top: 4900 ft., Bottom: 6550 ft., Determination Method: CALC | | Casing: | String Type: 1ST LINER, Hole Size: 4 in., Size: 3.5 in., Top: 0 ft., Depth: 9673 ft., Weight: 9.3 , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: 3300 ft., Bottom: 9673 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 5290 ft. | 8563 ft. | N | N | | ROLLINS | 8563 ft. | 8782 ft. | N | N | | COZZETTE | 8782 ft. | 8955 ft. | N | N | | CORCORAN | 8955 ft. | 9215 ft. | N | N | | SEGO | 9215 ft. | 9680 ft. | N | N |
Formation SEGO Formation Classification: GW Status: SI - 3/1/2023 Interval Top: 9426 ft. Interval Bottom: 9529 ft.| Completed Information for Formation SEGO | | 1st Production Date: | 2/21/2007 | Choke Size: | | | Formation Name: | SEGO | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/20/2006 | | Treatment Summary: | STAGES 01 TREATED WITH A TOTAL OF : 1,359 BBLS OF SLICKWATER, 55,556 LBS LBS 20-40 SAND. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation SEGO. |
| | Perforation Data: | | Interval Top: | 9426 ft. | # Of Holes: | 18 | | Interval Bottom: | 9529 ft. | Hole Size: | 0.34 in. |
|
Formation CRCRN Formation Classification: GW Status: SI - 3/1/2023 Interval Top: 9182 ft. Interval Bottom: 9293 ft.| Completed Information for Formation CORCORAN | | 1st Production Date: | 2/21/2007 | Choke Size: | | | Formation Name: | CORCORAN | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 12/30/2006 | | Treatment Summary: | STAGES 02 TREATED WITH A TOTAL OF: 1,640 BBLS OF SLICKWATER, 60,654 LBS 20-40 SAND WITH 24 BBLS 15% HCL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CRCRN. |
| | Perforation Data: | | Interval Top: | 9182 ft. | # Of Holes: | 18 | | Interval Bottom: | 9293 ft. | Hole Size: | 0.34 in. |
|
Formation WMFK Formation Classification: GW Status: SI - 12/1/2025 Interval Top: 6666 ft. Interval Bottom: 8455 ft.| Completed Information for Formation WILLIAMS FORK | | 1st Production Date: | 2/21/2007 | Choke Size: | 0.375 in. | | Formation Name: | WILLIAMS FORK | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 1/20/2007 | | Treatment Summary: | STAGES 03-10 TREATED WITH A TOTAL OF: 23,972 BBLS OF SLICKWATER, 848,971 LBS 20-40 SAND WITH 124 BBLS 15% HCL |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/2/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1170 | | CALC_MCF_GAS | 835 | | CASING_PRESS | 1428 | | MCF_GAS | 835 | | TUBING_PRESS | 619 |
| | Perforation Data: | | Interval Top: | 6666 ft. | # Of Holes: | 171 | | Interval Bottom: | 8455 ft. | Hole Size: | 0.28 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 22435 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 10.639 |
| Average MCFE per Day | 61.710 |
| Federal Financial Assurance | i | Y |
|
|