Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10723
Well Classification: OW Status: PR - 6/1/2019
Well Name/No:ASSOCIATED UNIT A #3X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/1/2019
FacilityID:284035LocationID:316525
County:RIO BLANCO #103Location:NENE 14 2N103W 6
Field:RANGELY - #72370Elevation:5529 ft.
Planned Location:1263FNL  1241 FELLat/Long: 40.146825 / -108.918622Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.146773 / -108.918599Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 6/1/2019             Measured TD: 6705 ft.    Vertical TD: 6701 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 6/1/2019
Wellbore Permit
Permit #:20070676 Expiration Date:4/9/2008
Prop Depth/Form:6829 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY WEBER S Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:5/4/2007
Spud Date:3/27/2007Spud Date Is:ACTUAL
Measured TD:6705 ft.Measured PB depth:6705 ft.
True Vertical TD:6701 ft.True Vertical PB depth:
Top PZ Location:Sec:14 Twp: 2N 103WFootage: 1460 FNL  1225 FELDepth
Bottom Hole Location:Sec:14 Twp: 2N 103WFootage: 1460 FNL  1225 FELDepth
Log Types:AI/SFEL; CPD/CDN; CBL
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2063 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 780, Top: 0 ft., Bottom: 2063 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6467 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 620, Top: 0 ft., Bottom: 6467 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3855 ft.NN
MORRISON3938 ft.NN
CURTIS4646 ft.NN
ENTRADA4754 ft.NN
CARMEL4897 ft.NN
NAVAJO4963 ft.NN
CHINLE5580 ft.NN
SHINARUMP5700 ft.NN
MOENKOPI5827 ft.NN
WEBER6473 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 6/1/2019                  Interval Top: 6473 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:5/19/2007
Treatment Summary:OPEN HOLE 6467-6705'. PUMP FRAVCTURE STIMULATION. STAGE 1 91-1 BBLS SCALE INHIBITOR @ 6.2 BPM 304 PSI. STAGE 2 640 BBLS FLUSH@ 53.6 BPM 1439 PSI. STAGES 3-8 TOTAL 329.4 BBLS YF130 @ AVG. 55.3 BPM 1192 PSI
Tubing Size:2.875 in.Tubing Setting Depth:6337 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/4/2007Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1351
BBLS_OIL 39
CALC_BBLS_H2O 1351
CALC_BBLS_OIL 39
CALC_GOR 9359
CALC_MCF_GAS 365
GRAVITY_OIL 34
MCF_GAS 365
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)10890
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day29.745
Average MCFE per Day172.517

 Federal Financial Assurance  i 

 Tribal Well  i No