Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/20/2022 | Treatment End Date: | 6/20/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 1900 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/8/2021 | Treatment End Date: | 2/8/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH MUTUAL SOLVENT AND 46 BBLS WATER.
|
Total fluid used in treatment (bbls): | 94 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 46 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/22/2020 | Treatment End Date: | 6/22/2020 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W6% CITRIC ACID AND 45 BBLS WATER
|
Total fluid used in treatment (bbls): | 92 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/26/2015 | Treatment End Date: | 5/26/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 205 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 110 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 6/8/2007 |
Treatment Summary: | PUMP 104 BBLS SCALE INHIBITOR@ 9 BPM 650 PSI PUMP 100,780# 20/40 RISIN COATED PROPPANT FROM 2 TO 8 BPM @ AVERAGE 917 PSI |