|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: SI - 9/1/2025 Measured TD: 12820 ft. Vertical TD: 12793 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW SI - 9/1/2025 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20060325 | Expiration Date: | 3/14/2007 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 475 FSL 1037 FEL | | Bottom Hole Location: | Sec: Twp: | Footage: 475 FSL 1037 FEL | | Proposed Depth/Form: | 13300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | PICEANCE CRK UN | Unit Number: | COC 47666X | | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: , Unit Acreage: 20, Drill Unit: | | Formation And Spacing: | Code: OHCRK , Formation: OHIO CREEK , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: WSTC , Formation: WASATCH , Order: , Unit Acreage: 20, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/19/2007 | | Spud Date: | 12/19/2006 | Spud Date Is: | ACTUAL | | Measured TD: | 12820 ft. | Measured PB depth: | 12700 ft. | | True Vertical TD: | 12793 ft. | True Vertical PB depth: | 12673 ft. | | Top PZ Location: | Sec:3 Twp: 2S 97W | Footage: 414 FSL 915 FEL | | Bottom Hole Location: | Sec:3 Twp: 2S 97W | Footage: 414 FSL 915 FEL | | Log Types: | MUD LOGS, CBL, DIRECTIONAL SURVEY, CEMENT REPORTS | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 150 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 98, Top: 0 ft., Bottom: 150 ft., Determination Method: CALC | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 3759 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1150, Top: 1687 ft., Bottom: 3759 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7 in., Top: 0 ft., Depth: 8606 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 520, Top: 5470 ft., Bottom: 8606 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 4.5 in., Top: 0 ft., Depth: 12820 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 990, Top: 4000 ft., Bottom: 12820 ft., Determination Method: CALC | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 5455 ft. | 7261 ft. | N | N | | OHIO CREEK | 7261 ft. | 7570 ft. | N | N | | WILLIAMS FORK - CAMEO | 7570 ft. | 11446 ft. | N | N | | ROLLINS | 11446 ft. | 11637 ft. | N | N | | COZZETTE | 11637 ft. | 11913 ft. | N | N | | CORCORAN | 11913 ft. | 12827 ft. | N | N |
Formation WFCM Formation Classification: GW Status: SI - 9/1/2025 Interval Top: 8843 ft. Interval Bottom: 10916 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/15/2007 | Choke Size: | 0.438 in. | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/13/2007 | | Treatment Summary: | FRAC W/730,000# 40/70 API PROPPANT. SET FRAC PLUGS AT 10,940 & 10,382. DO ALL FRAC PLUGS. SET PERMANENT BRIDGE PLUG AT 10,940 TO ISOLATE HORIZONTAL PORTION OF WELL. FISH IN WELLBORE AT 12,142'-12,610'. |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 10827 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/17/2007 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| CALC_BBLS_H2O | 2242 | | CALC_BBLS_OIL | 0 | | CALC_GOR | 0 | | CALC_MCF_GAS | 4982 | | CASING_PRESS | 1625 |
| | Perforation Data: | | Interval Top: | 8843 ft. | # Of Holes: | 180 | | Interval Bottom: | 10916 ft. | Hole Size: | 0.32 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 11/2024 - 10/2025 |
| Total Oil Produced (Barrels) | 12 |
| Total Gas Produced (MCF) | 44 |
| GOR | 3666 |
| GOR Determination | BOE |
| Average BOE per Day | 0.054 |
| Average MCFE per Day | 0.306 |
| Federal Financial Assurance | i | Y |
|
|