Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-10709
Well Classification: OW Status: PR - 12/1/2021
Well Name/No:M.C. HAGOOD A #21X
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:D 052265
Facility Status:PRStatus Date12/1/2021
FacilityID:283469LocationID:316522
County:RIO BLANCO #103Location:SWSE 10 2N103W 6
Field:RANGELY - #72370Elevation:5593 ft.
Planned Location:133FSL  1507 FELLat/Long: 40.150694 / -108.938380Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.150706 / -108.938393Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 12/1/2021             Measured TD: 6770 ft.    Vertical TD: 6750 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 12/1/2021
Wellbore Permit
Permit #:20060117 Expiration Date:2/24/2007
Prop Depth/Form:6893 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:RANGELY WEBR SD Unit Number:COC 47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/10/2007
Spud Date:9/23/2006Spud Date Is:ACTUAL
Measured TD:6770 ft.Measured PB depth:6770 ft.
True Vertical TD:6750 ft.True Vertical PB depth:
Top PZ Location:Sec:15 Twp: 2N 103WFootage: 178 FNL  1318 FELDepth
Bottom Hole Location:Sec:15 Twp: 2N 103WFootage: 178 FNL  1318 FELDepth
Log Types:CEMENT BOND; CALIPER; ARRAY IND.; COMP.DENSITY/NEUTRON LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2053 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 840, Top: 0 ft., Bottom: 2053 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6628 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: 2240 ft., Bottom: 6628 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
DAKOTA3980 ft.NN
MORRISON4093 ft.NN
CURTIS4807 ft.NN
ENTRADA4912 ft.NN
CARMEL5052 ft.NN
NAVAJO5100 ft.NN
CHINLE5737 ft.NN
SHINARUMP5860 ft.NN
MOENKOPI5960 ft.NN
WEBER6607 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 12/1/2021                 Interval Top: 6607 ft.

 Completed Information for Formation WEBER
1st Production Date:4/11/2007Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:3/30/2007
Treatment Summary:OPEN HOLE 6628-6770'. FRACTURE STIMULATE THE OPEN HOLE IN 8 STAGES, PUMP 122 BBL SCALE INHIBITOR SQUEEZE. PUMP 1665 BBLS SAND, MAX RATE 60.75 BPM & MAX PSI 1654#.
Tubing Size:2.875 in.Tubing Setting Depth:6594 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/11/2007Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1519
BBLS_OIL 525
CALC_BBLS_H2O 1519
CALC_BBLS_OIL 525
CALC_GOR 665
CALC_MCF_GAS 349
GRAVITY_OIL 34
MCF_GAS 349
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)4318
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day11.818
Average MCFE per Day68.542

 Federal Financial Assurance  i Y

 Tribal Well  i No